
About this project
The photos show a freestanding Taco Cabana: the brand’s magenta sign tower, a glass dining room on two sides, a fenced patio with decorative metal panels under the canopy, and the drive-thru side of the building, photographed at dusk with the dining room lit. Inside, the dining room pairs wood tables with black tile and string lights.
The two Taco Cabana projects on record were remodels of operating restaurants: 4,034 sq ft on Precinct Line Road in Hurst and 4,015 sq ft on Westheimer Road in Houston. A remodel like this brings a freestanding store up to the brand’s current design, patio, dining room and signage included, while the restaurant keeps serving. The store in the photographs carries the building number 1495, the Hurst location.
Harrison builds restaurants & qsr projects as tenant finish-outs, freestanding buildings and remodels, with pre-construction first. More about restaurants & qsr construction.
What a build like this involves
- A walk-through of the open restaurant: what stays, what goes, where the work can be staged without closing the kitchen
- Phasing: dining room, restrooms, exterior and kitchen in a sequence that keeps the doors open or limits the closure to days, not weeks
- Demolition and the new finishes: flooring, tile, millwork, seating, lighting, the brand’s current graphics package and signage
- Kitchen and equipment changes, hood and fire-suppression updates, and any accessibility and code items the city asks for with the permit
- Night and off-hours work where needed, daily clean-up, and the final inspections with the store still trading
Taco Cabana locations on record
Harrison Construction has completed 2 Taco Cabana projects on record, in Houston and Hurst: renovations, contracts of $250,000–$500,000, from 4,015 to 4,034 sq ft.
| City | Address | Size | Work | Completed | Contract |
|---|---|---|---|---|---|
| Houston, TX | 6522 Westheimer Rd | 4,015 sq ft | Renovation | $250K–$500K | |
| Hurst, TX | 1495 Precinct Line Rd | 4,034 sq ft | Renovation | 2018 | $250K–$500K |
The store in the photographs carries the building number 1495, the Hurst location on Precinct Line Road.
- Client
- Taco Cabana
- Industry
- Restaurants & QSR
- Format
- Freestanding restaurant with patio
- Location
- 2 locations: Houston and Hurst
- Project type
- Renovation
- Completed
- 2018
- Contract range
- $250K–$500K
- Services for this type
- Commercial renovations, Pre-construction, Construction management
Lonnie helped me bring in project after project, on time and under budget. He takes pride in his finished product so he hires the right people for his team and then places them in the correct job position.
Project photography
Photos from the Harrison Construction project gallery. More photos and the project facts are added as the owner confirms them.
Why owners choose Harrison for a restaurants project
Restaurants, finish-outs and medical offices, built here
Founded in Fort Worth by Lonnie Harrison, who has more than 25 years in construction. 190 completed projects on record in 8 states, for Firehouse Subs, Sonic, Five Guys, Taco Cabana, Starbucks, El Pollo Loco and 7-Eleven, among 73 brands.
Licensed in Texas and 29 other states
What a landlord, a lender and a franchise brand ask for first, with a ground-up division and a finish-out team under one roof.
Meetings, reports, changes priced first
Regular progress meetings and electronic project reports from the site visit to the punch list. A change is priced and approved before it is built.
Does Harrison Construction build Taco Cabana restaurants?
Taco Cabana is on the Harrison Construction client list, and the freestanding restaurant in these photos is from our project gallery. Ask us about the location you are planning.
Can you remodel a restaurant that stays open?
Yes. Both Taco Cabana projects on record were remodels of operating restaurants. The work is phased around service hours so the store keeps trading.
Can you build a freestanding restaurant with a patio and a drive-thru?
Yes. Freestanding restaurants are the work of our ground-up division: site work, structure, kitchen, dining room, patio and drive-thru under one contract.
Are you bonded and insured?
Yes. Harrison Construction is fully bonded and insured, and licensed in Texas and 29 other states.
How do I get a price for a project like this?
Send the address, the lease or the site status, any drawings or the brand’s prototype and the date you need to open. We visit the site, review the documents and come back with a conceptual estimate, value-engineering options and a schedule.
More from the gallery

Planning a restaurants project like this one?
Planning a new location, build-out, renovation or commercial development? Tell us about your project and we’ll help identify the next step.
What to send us
The address, the lease or letter of intent, any drawings or the brand’s prototype set, and the date you need to open. Not all of it is needed to start the conversation.
Email office@harrisonconstructionteam.com or call (817) 988-0242.






