Harrison ConstructionFort Worth, Texas
  1. Home
  2. Services
  3. Tenant Finish-Outs & Build-Outs
Services

Tenant finish-outs and commercial build-outs

Harrison Construction was founded in 2011 to do interior finish-out work, and it is still the core of what we build: restaurant, retail, office and medical tenants moving into shell space, and landlords whose tenants need space built out. We handle due diligence, estimating, permitting, the build and close-out documents, with regular reports to the owner.

  • 103 finish-outs on record, 876 to 45,269 sq ft
  • For Firehouse Subs, Five Guys, Snappy Salads, Phenix Salon Suites and 36 more
  • 78 in Dallas–Fort Worth, 25 elsewhere in Texas and 3 other states
An unfinished commercial interior with white walls ready for build-out
What it includes

What tenant finish-outs covers

  • Review of the landlord’s delivery condition and the tenant improvement scope
  • Estimating and value engineering of the finish-out
  • Permitting with the city
  • Demolition of a previous tenant’s finish-out where needed
  • Mechanical, electrical and plumbing rough-in with the trades
  • Walls, ceilings, storefront, flooring and finishes
  • Kitchen, equipment and specialty coordination
  • Inspections, punch list and close-out
Who needs it
  • Restaurant tenantsin strip centers, mixed-use buildings and second-generation restaurant space.
  • Retail and office tenantstaking a shell space or re-planning an existing one.
  • Dental and medical tenantswhose finish-out needs plumbing, gas and equipment coordination.
  • Landlordswho deliver finished space to a tenant or need a vacant suite made ready to lease.
Lonnie helped me bring in project after project, on time and under budget. He takes pride in his finished product so he hires the right people for his team and then places them in the correct job position.
Jerrel DentonFranchise Sales
Commercial project considerations

What to settle early

Shell versus second generation

A shell space needs everything from the slab up; a second-generation space has walls, utilities and sometimes a hood already in place, which can save cost or add demolition. The site visit tells us which.

The lease sets the scope

Delivery condition, tenant improvement allowance and the landlord’s requirements decide what you build and what the landlord builds. We read the lease exhibits with you before pricing.

Opening date first

The schedule works backward from the day you need to open: permits, long-lead items, inspections and the trades in the right order.

Harrison’s capabilities

Interior finish-out work is where Harrison Construction started and the type of project we have done most often, for restaurant brands, retail tenants, dental practices and their landlords across Fort Worth and Dallas–Fort Worth. Fully bonded and insured.

How the service runs
  1. Site visit, lease review and due diligence
  2. Estimate, value engineering and schedule
  3. Permits and subcontractor bidding
  4. Demolition, rough-in, finishes, equipment
  5. Inspections, punch list and close-out documents
On record

103 finish-outs we have completed

From the Harrison Construction project records: Firehouse Subs (29), Five Guys (11), Snappy Salads (6), Phenix Salon Suites (5), Luna Grill (5), Dillas Quesadillas (4), Man’s Best Friend (4), Grip Med Grill (3) and 32 more, with contracts ranging from under $25,000 to $1 million–$2 million.

All projects on record
ProjectCityAddressSizeWorkCompletedContract
Terra MediterraneanPlano, TX2401 Dallas Parkway, Suite RS-17,413 sq ftTenant Finish-Out2018$1M–$2M
Phenix Salon SuitesProsper, TX4580 West University Suite 907,350 sq ftTenant Finish-Out2023$1M–$2M
Riviera SpaDallas, TX6959 Arapaho Rd Suite 1017,449 sq ftTenant Finish-Out$1M–$2M
GAPCoRichardson, TX520 Lockwood Dr. Suite #2004,800 sq ftTenant Finish-Out · Ovens$500K–$1M
Dillas QuesadillasFrisco, TX3930 Preston Rd. #1402,800 sq ftTenant Finish-Out · Drive-thru expansion2017$500K–$1M
MooyahMelissa, TX140 Bucces Blvd Suite 5001,212 sq ftTenant Finish-Out$500K–$1M
Dillas QuesadillasForney, TX303 Marketplace Blvd2,950 sq ftTenant Finish-Out$250K–$500K
Luna GrillSouthlake, TX1141 E Southlake Blvd #5304,000 sq ftTenant Finish-Out2015$250K–$500K
Dillas QuesadillasPlano, TX2008 Midway Rd3,200 sq ftTenant Finish-Out$250K–$500K
Fat StrawsArlington, TX4001 W. Matlock Rd1,900 sq ftTenant Finish-Out$250K–$500K
Clifton’s FurnitureDurant, OK2432 W Main18,000 sq ftTenant Finish-Out$250K–$500K
Luna GrillColleyville, TX5505 Colleyville Blvd #1002,900 sq ftTenant Finish-Out2015$250K–$500K
Firehouse SubsStephenville, TX2675 W. Washington #2001,900 sq ftTenant Finish-Out$250K–$500K
Firehouse SubsCleburne, TX1663 W. Henderson St1,900 sq ftTenant Finish-Out2023$250K–$500K
Dillas QuesadillasMcKinney, TX3510 W University, Suite 1022,200 sq ftTenant Finish-Out2018$250K–$500K
How Do You RollPlano, TX1921 Preston Rd #20002,390 sq ftTenant Finish-Out$250K–$500K
Firehouse SubsCoppell, TX150 S Denton Tap Rd1,900 sq ftTenant Finish-Out2023$250K–$500K
Jamba JuiceMansfield, TX3000 E Broad St Suite 1041,800 sq ftTenant Finish-Out$250K–$500K
Grip Med GrillArlington, TX115 West 2nd St.3,000 sq ftTenant Finish-Out2013$250K–$500K
Luna GrillFlower Mound, TX2500 Cross Timbers Rd3,400 sq ftTenant Finish-Out2014$250K–$500K
Pei WeiHurst, TX1460 Precinct Line Rd3,400 sq ftTenant Finish-Out2014$250K–$500K
Grip Med GrillDenton, TX1200 West Hickory Street3,000 sq ftTenant Finish-Out2012$250K–$500K
Firehouse SubsPlano, TX901 Central Expressway Suite #3001,900 sq ftTenant Finish-Out2022$250K–$500K
Firehouse SubsCross Roads, TX11750 US 380 #2101,900 sq ftTenant Finish-Out$250K–$500K
Grip Med GrillDallas, TX6030 Luther Lane, Suite 1403,000 sq ftTenant Finish-Out2012$250K–$500K
Firehouse SubsRed Oak, TX106 E. Ovilla Rd #31,900 sq ftTenant Finish-Out$100K–$250K
Pizza SnobDenton, TX321 W Hickory St #1081,879 sq ftTenant Finish-Out2015$100K–$250K
Outback SteakhouseMesquite, TX3903 Towne Crossing Blvd9,065 sq ftTenant Finish-Out$100K–$250K
Firehouse SubsWaxahachie, TX1400 North Hwy 77 # 4001,900 sq ftTenant Finish-Out$100K–$250K
Pizza InnDurant, OK415 Westside Dr3,000 sq ftTenant Finish-Out2019$100K–$250K
Fluellen CupcakesFrisco, TX5001 Panther Creek Pkwy # 5001,200 sq ftTenant Finish-Out$100K–$250K
Firehouse SubsKeller, TX1411 Keller Pkwy1,900 sq ftTenant Finish-Out2018$100K–$250K
Dollar TreeBenbrook, TX9461 Benbrook BlvdTenant Finish-Out$100K–$250K
Goody’sDurant, OK6,000 sq ftTenant Finish-Out · Shell building$100K–$250K
Crossroads ResaleDallas, TX2646 Main St. Suite 120Tenant Finish-Out · Store close-down2018$100K–$250K
Society BakeryDallas, TX3610 Greenville Ave876 sq ftTenant Finish-Out2016$100K–$250K
Pacific PoolsFort Worth, TX5761 Park Vista Circle5,200 sq ftTenant Finish-Out$100K–$250K
Terra MediterraneanFort Worth, TX2973 Crockett St5,800 sq ftTenant Finish-Out2014$50K–$100K
CopartHaslet, TX950 Blue Mound Road West45,269 sq ftTenant Finish-Out$50K–$100K
Farma Keio Retina CenterRichardson, TX4951 Long Prairie Rd4,500 sq ftTenant Finish-Out2025$25K–$50K
Mama Garducci’sAustin, TX730 W Stassney Ln1,290 sq ftTenant Finish-Out2015Under $25K
Luxe OptixSouthlake, TX1959 W Southlake Blvd #1301,000 sq ftTenant Finish-Out2015Under $25K
Gatik AI Control CenterDenison, TX7360 FM 1417 Suite 2018,000 sq ftTenant Finish-OutUnder $25K
Firehouse SubsCedar Hill, TX352 N Hwy 671,900 sq ftTenant Finish-Out, Renovation · Remodel2015Under $25K
Firehouse SubsAddison, TX4135 Belt Line Rd. Suite 1201,900 sq ftTenant Finish-Out2026
Firehouse SubsArlington, TX1805 N Collins St1,900 sq ftTenant Finish-Out2017
Firehouse SubsAthens, TX1010 East Tyler St. # 1001,900 sq ftTenant Finish-Out2023
Firehouse SubsCypress, TX9430 Fry Rd, Suite 1001,900 sq ftTenant Finish-Out2025
Firehouse SubsDallas, TX18208 Preston Rd1,900 sq ftTenant Finish-Out2016
Firehouse SubsDallas, TX5549 LBJ Fwy # 1501,900 sq ftTenant Finish-Out2023
Firehouse SubsForney, TX514 W. US Hwy 801,900 sq ftTenant Finish-Out2023
Firehouse SubsFort Worth, TX4845 Bryant Irvin Rd1,900 sq ftTenant Finish-Out2015
Firehouse SubsFort Worth, TX501 Alta Mere Dr1,900 sq ftTenant Finish-Out2015
Firehouse SubsGranbury, TX325 E Hwy 3771,900 sq ftTenant Finish-Out2016
Firehouse SubsHumble, TX7036 FM 1960 E. Unit A-21,900 sq ftTenant Finish-Out2025
Firehouse SubsKaty, TX29615 Jordan Ranch Crossing # 2101,900 sq ftTenant Finish-Out2026
Firehouse SubsLewisville, TX2325 S. Stemmons Fwy #3081,900 sq ftTenant Finish-Out2015
Firehouse SubsMcKinney, TX2890 Craig Dr1,900 sq ftTenant Finish-Out2015
Firehouse SubsOwasso, OK9538 N Garnett Rd1,900 sq ftTenant Finish-Out2015
Firehouse SubsRichardson, TX1390 E Belt Line Rd1,900 sq ftTenant Finish-Out2016
Firehouse SubsSaginaw, TX1005 N. Saginaw Blvd, Suite 1021,900 sq ftTenant Finish-Out2025
Firehouse SubsTemple, TX145 Westfield Blvd Suite 1201,900 sq ftTenant Finish-Out2023
Firehouse SubsWaco, TX4215 Franklin Ave1,900 sq ftTenant Finish-Out2025
Firehouse SubsWichita Falls, TX3201 Lawrence Rd1,900 sq ftTenant Finish-Out2017
Five GuysAmarillo, TX2313 S Georgia St2,400 sq ftTenant Finish-Out2015
Five GuysArlington, TX4245 S Cooper St2,400 sq ftTenant Finish-Out2015
Five GuysDallas, TX13350 Dallas Pkwy2,400 sq ftTenant Finish-Out2015
Five GuysFort Worth, TX313 Houston St2,400 sq ftTenant Finish-Out2013
Five GuysIrving, TX6440 N MacArthur Blvd2,400 sq ftTenant Finish-Out2015
Five GuysLubbock, TX6076 Marsha Sharp Fwy2,400 sq ftTenant Finish-Out2014
Five GuysMesquite, TX1725 N Town E Blvd2,400 sq ftTenant Finish-Out2015
Five GuysMidland, TX2816 Loop 250 Frontage Rd #3002,400 sq ftTenant Finish-Out2015
Five GuysPlano, TX1201 E Spring Creek Pkwy2,400 sq ftTenant Finish-Out2015
Five GuysRockwall, TX1035 I-302,400 sq ftTenant Finish-Out2015
Five GuysWichita Falls, TX3100 Midwestern Pkwy2,400 sq ftTenant Finish-Out2013
Snappy SaladsDallas, TX717 N. Harwood1,911 sq ftTenant Finish-Out2017
Snappy SaladsFort Worth, TX1664 S. University Dr., Suites D & E2,893 sq ftTenant Finish-Out2017
Snappy SaladsFrisco, TX5252 West Main St. Suite 1002,501 sq ftTenant Finish-Out
Snappy SaladsLewisville, TX4940 State Highway 1212,300 sq ftTenant Finish-Out
Snappy SaladsPlano, TX5588 TX 1212,200 sq ftTenant Finish-Out2016
Snappy SaladsPlano, TX5930 W Park Blvd1,987 sq ftTenant Finish-Out2016
Luna GrillDallas, TX3921 Gaston Ave. Suite A2,700 sq ftTenant Finish-Out
Luna GrillPlano, TX2444 Preston Rd2,699 sq ftTenant Finish-Out
Phenix Salon SuitesArlington, TX3811 S. Cooper St. Suite 220610,256 sq ftTenant Finish-Out
Phenix Salon SuitesArlington, TX536 W Randol Mill Rd9,551 sq ftTenant Finish-Out
Phenix Salon SuitesLeague City, TX2805 Gulf Freeway6,100 sq ftTenant Finish-Out
Phenix Salon SuitesTulsa, OK5517 East 41st Street5,975 sq ftTenant Finish-Out
Man’s Best FriendCarrollton, TX2641 Westgrove Dr5,429 sq ftTenant Finish-Out2017
Man’s Best FriendGrand Prairie, TX1290 W Pioneer Pkwy10,458 sq ftTenant Finish-Out2017
Man’s Best FriendHouston, TX2331 Bingle Rd6,510 sq ftTenant Finish-Out2017
Man’s Best FriendMcKinney, TX4610 W. El Dorado #7006,519 sq ftTenant Finish-Out2017
OishiiDallas, TX5627 SMU Boulevard1,700 sq ftTenant Finish-Out
OishiiPlano, TX8448 Parkwood Blvd # 7001,400 sq ftTenant Finish-Out
Fat StrawsRichardson, TX1,900 sq ftTenant Finish-Out
Which WichKansas City, MO554 Westport Rd #1001,656 sq ftTenant Finish-Out
Which WichSan Antonio, TX2026 Babcock Rd1,390 sq ftTenant Finish-Out
CoCo IchibanyaHaltom City, TX3970 N.E. Loop 820 Suite 3002,400 sq ftTenant Finish-Out
Curry Up NowFlower Mound, TX2717 Cross Timbers Rd # 4001,879 sq ftTenant Finish-Out
Dugan DoghouseAurora, CO6830 S Liverpool St9,341 sq ftTenant Finish-Out2017
Gather KitchenDallas, TX1601 Elm St2,400 sq ftTenant Finish-Out
Green VaporLittle Elm, TX2,790 sq ftTenant Finish-Out2014
Kool SmilesMidland, TX1000 N Midkiff Rd10,000 sq ftTenant Finish-Out
Mike’s ChickenFrisco, TX9970 Dallas Parkway3,800 sq ftTenant Finish-Out

From the Harrison Construction project records. Sizes are the leased or built area of the space. Contract is the range of the contract value, never the amount; a blank means the office has not added it yet.

Why Harrison

Why owners choose Harrison for tenant finish-outs

Since 2011

Restaurants, finish-outs and medical offices, built here

Founded in Fort Worth by Lonnie Harrison, who has more than 25 years in construction. 190 completed projects on record in 8 states, for Firehouse Subs, Sonic, Five Guys, Taco Cabana, Starbucks, El Pollo Loco and 7-Eleven, among 73 brands.

Bonded and insured

Licensed in Texas and 29 other states

What a landlord, a lender and a franchise brand ask for first, with a ground-up division and a finish-out team under one roof.

You always know where it stands

Meetings, reports, changes priced first

Regular progress meetings and electronic project reports from the site visit to the punch list. A change is priced and approved before it is built.

FAQ

Questions about tenant finish-outs

All questions and answers

What is a tenant finish-out?

The construction that turns a leased commercial space into a working restaurant, store, office or clinic: walls, ceilings, utilities, finishes, storefront and equipment, built to the tenant’s plans and the landlord’s requirements.

Do you work for landlords?

Yes. Landlords whose tenants need space built out, and landlords preparing a vacant suite, are among the clients we work with.

Can you finish out a shell space?

Yes. Shell space and second-generation space are both part of our work, and the site visit shows what each will need.

What do I get at close-out?

The punch list finished and the close-out documents gathered, with the project finished on time and within budget as the goal.

Do you help before the lease is signed?

Yes. Pre-construction covers due diligence, conceptual estimating, value engineering and constructability review, so you know what a space will cost to finish out.

Restaurant interior with wood screens and daylight
Discuss your project

Planning a project that needs tenant finish-outs?

Planning a new location, build-out, renovation or commercial development? Tell us about your project and we’ll help identify the next step.

What to send us

The address, the lease or letter of intent, any drawings or the brand’s prototype set, and the date you need to open. Not all of it is needed to start the conversation.

Email office@harrisonconstructionteam.com or call (817) 988-0242.

CallDiscuss your project