Harrison ConstructionFort Worth, Texas
  1. Home
  2. Services
  3. Ground-Up Commercial Construction
Services

Ground-up commercial construction

Harrison Construction started with interior finish-outs and later set up a ground-up division for freestanding buildings. We build freestanding restaurants, drive-thru and pad-site buildings and other small commercial buildings, with pre-construction, permitting, construction management and close-out under one contract.

  • 13 ground-up buildings on record, 931 to 8,000 sq ft
  • For El Pollo Loco, Starbucks, Dillas Quesadillas, Northlake Storage and 1 more
  • 11 in Dallas–Fort Worth, 2 elsewhere in Texas and 1 other state
A freestanding Starbucks with a drive-thru in Denton, Texas, built ground-up by Harrison Construction
What it includes

What ground-up construction covers

  • Site due diligence and constructability review
  • Estimating and value engineering of the building and the site work
  • Permitting and coordination with the city and utilities
  • Site work, foundation, structure and envelope through the trades
  • Interior build-out, kitchen and equipment for restaurants
  • Drive-thru, patio, parking and site elements
  • Inspections, certificate of occupancy and close-out
Who needs it
  • Restaurant brands and franchiseesbuilding a freestanding or drive-thru location on a pad site.
  • Developers and landownersdelivering a pad building for a single tenant.
  • Convenience-store and retail operatorswith a prototype building to repeat.
  • Owners who compared ground-up with conversionand chose to build new.
Lonnie helped me bring in project after project, on time and under budget. He takes pride in his finished product so he hires the right people for his team and then places them in the correct job position.
Jerrel DentonFranchise Sales
Commercial project considerations

What to settle early

More parties, longer lead

A ground-up project involves the site, the utilities, the civil work and the building. Permitting and site conditions take longer to settle than in a finish-out, which is why pre-construction matters even more.

The prototype meets the site

A brand’s prototype drawings need to be adapted to the lot, the grade, the utilities and the city’s requirements. Constructability review finds those adjustments early.

One team to the opening

The same team that builds the shell finishes the interior, so there is no handoff between a building contractor and a finish-out contractor.

Harrison’s capabilities

Our ground-up buildings include freestanding Starbucks stores with drive-thrus in Denton, Early and Irving, Dillas Quesadillas restaurants in Frisco and in Ruston, Louisiana, El Pollo Loco restaurants and the Northlake RV and Boat Storage facility with its canopies and site work.

How the service runs
  1. Site visit, due diligence and prototype review
  2. Estimate, value engineering and development schedule
  3. Permits, bidding and subcontractor qualification
  4. Site work, structure, envelope and interior
  5. Inspections, certificate of occupancy and close-out
On record

13 ground-up buildings we have completed

From the Harrison Construction project records: El Pollo Loco (6), Starbucks (3), Dillas Quesadillas (2), Northlake Storage and Huffman Warehouse, with contracts ranging from $100,000–$250,000 to more than $2 million.

All projects on record
ProjectCityAddressSizeWorkCompletedContract
Northlake StorageNorthlake, TX1801 Whyte Rd440,000 sq ft site, 876 sq ft buildingGround-Up · Phase 1 · Phases 2 and 3, canopiesOver $2M
Dillas QuesadillasFrisco, TX2055 University Dr3,000 sq ftGround-Up$1M–$2M
El Pollo LocoGrand Prairie, TX2660 S HWY 1613,150 sq ftGround-Up2018$1M–$2M
Dillas QuesadillasRuston, LA1003 Cooktown Rd1,400 sq ftGround-Up2024$500K–$1M
StarbucksIrving, TX4080 W. Airport Freeway931 sq ftGround-Up$500K–$1M
Huffman WarehouseGrapevine, TX3324 Hall Johnson Rd8,000 sq ftGround-Up$100K–$250K
El Pollo LocoArlington, TX4911 S Cooper St3,150 sq ftGround-Up
El Pollo LocoBedford, TX1900 Central Rd3,150 sq ftGround-Up
El Pollo LocoGrand Prairie, TX2125 N State Hwy 3603,150 sq ftGround-Up
El Pollo LocoHurst, TX1245 W Pipeline Rd3,150 sq ftGround-Up
El Pollo LocoIrving, TX2137 Estrada Pkwy3,150 sq ftGround-Up
StarbucksDenton, TX4910 Teasley Lane1,980 sq ftGround-Up
StarbucksEarly, TX117 Early Blvd2,200 sq ftGround-Up

From the Harrison Construction project records. Sizes are the leased or built area of the space. Contract is the range of the contract value, never the amount; a blank means the office has not added it yet.

Why Harrison

Why owners choose Harrison for ground-up construction

Since 2011

Restaurants, finish-outs and medical offices, built here

Founded in Fort Worth by Lonnie Harrison, who has more than 25 years in construction. 190 completed projects on record in 8 states, for Firehouse Subs, Sonic, Five Guys, Taco Cabana, Starbucks, El Pollo Loco and 7-Eleven, among 73 brands.

Bonded and insured

Licensed in Texas and 29 other states

What a landlord, a lender and a franchise brand ask for first, with a ground-up division and a finish-out team under one roof.

You always know where it stands

Meetings, reports, changes priced first

Regular progress meetings and electronic project reports from the site visit to the punch list. A change is priced and approved before it is built.

FAQ

Questions about ground-up construction

All questions and answers

Do you build from the ground up?

Yes. Our ground-up division builds freestanding restaurants and other small commercial buildings, in addition to interior finish-outs.

Do you build drive-thru and drive-in restaurants?

Freestanding restaurant brands with drive-thru and drive-in formats are on our client list, including Sonic, Taco Cabana and Starbucks. Ask us about the format you are planning.

Can you build outside Texas?

Yes. Harrison Construction is licensed in other states for brands that roll out several locations. Ask us about the states you are planning.

How is ground-up different from a finish-out?

Ground-up adds the site, the foundation, the structure, the envelope and the utility connections, with more reviewing parties and longer permitting. A finish-out starts from a space a landlord delivers.

Restaurant interior with wood screens and daylight
Discuss your project

Planning a project that needs ground-up construction?

Planning a new location, build-out, renovation or commercial development? Tell us about your project and we’ll help identify the next step.

What to send us

The address, the lease or letter of intent, any drawings or the brand’s prototype set, and the date you need to open. Not all of it is needed to start the conversation.

Email office@harrisonconstructionteam.com or call (817) 988-0242.

CallDiscuss your project