Harrison ConstructionFort Worth, Texas
  1. Home
  2. Industries
  3. Medical & Dental Construction
  4. Dallas
Dallas dental and medical

Dental and medical office construction in Dallas

Harrison Construction builds out dental and medical offices in Dallas and the cities around it. Our records include a retina center finish-out and a clinic renovation in Richardson and medical renovations in North Richland Hills and Hurst. Brident Dental and Cool Smiles Dental are on our client list.

  • 5 projects on record
  • 5 brands, 3 cities
  • Fully bonded and insured
A modern dental operatory with a chair and equipment

Which general contractor should a dentist hire for a new office in Dallas?

Hire one that has built dental and medical space, that talks to your equipment supplier before the walls are framed, and that gives you a real estimate before you sign the lease. A dental office looks simple from the waiting room. Behind it are plumbing to every operatory, vacuum and compressed air, a mechanical room, imaging and sterilization, all set by the equipment you choose.

Brident Dental and Cool Smiles Dental are on Harrison Construction’s client list, and a 10,000 sq ft Kool Smiles finish-out in Midland is on our project records. In the Dallas area, our records include the Farma Keio Retina Center finish-out and a QuikMed renovation, both in Richardson.

Medical office finish-outs in Dallas

A medical finish-out is planned around patient flow and the equipment in each room. Exam and procedure rooms need the right plumbing, power, lighting and wall backing; imaging rooms have shielding and layout requirements set by the equipment and the reviewing authorities; and sound separation between rooms matters more than in most commercial space.

Many Dallas practices lease in medical office buildings, where the building has its own rules for working hours, deliveries, shared systems and after-hours work. We collect them at the start, so they are in the price and the schedule.

What to settle before you sign the lease

Most cost surprises in a practice build-out come from the space, not the design. These are the questions we answer in pre-construction.

  • Plumbing under the slaboperatories and exam rooms need supply and waste where the chairs and sinks go. On a slab on grade that means trenching; on an upper floor it means working above the ceiling of the tenant below.
  • Electrical serviceimaging, sterilizers, compressors and vacuum pumps add load. The suite’s service has to carry it or be upgraded.
  • Mechanicalventilation and temperature control for treatment rooms, the lab and the mechanical room, checked against the existing units.
  • Accessibilityaccessible routes, restrooms and reception. Texas requires an accessibility review by a registered accessibility specialist for larger commercial projects.
  • The work letterwhat the landlord delivers, what the allowance covers and what is left for the practice to pay.

Opening a second office or remodeling the first

A practice that adds operatories or exam rooms usually cannot close. We plan the phases and the after-hours work with you before pricing. For a second location, what worked in the first office, from the equipment layout to the finish schedule, is reused and priced early.

From Fort Worth to Dallas

Our office is in north Fort Worth, and Dallas, Richardson, Irving and Plano are part of our everyday service area. Lonnie Harrison, who founded the company in 2011, spent five years in medical construction with a general contractor before that. Alex Lioumis, VP of Operations, oversees the field, and Anne Hickey coordinates the schedule and the subcontractors.

Related: Dental and medical office construction in DFW · Surgery center construction · Commercial construction in Dallas · Commercial general contractor in Fort Worth.

I would be elated to work with Mr Harrison on future projects as I only expect successful and positive outcomes in large part to the direction and effort that Mr. Harrison brings to the project team.
Mike MorganM2 Engineering LLC
On record

5 medical projects in Dallas–Fort Worth

Medical finish-outs and renovations in Dallas–Fort Worth from the Harrison Construction project records. Nick Ritter Medical Office Building, QT Quik Med, Midcities Wound Care, Farma Keio Retina Center and QuikMed, in Richardson, North Richland Hills and Hurst, contracts ranging from $25,000–$50,000 to $100,000–$250,000.

All projects on record
ProjectCityAddressSizeWorkCompletedContract
Nick Ritter Medical Office BuildingHurst, TX615 HarwoodRenovation$100K–$250K
QT Quik MedNorth Richland Hills, TX8501 Mid-Cities Blvd #3002,400 sq ftRenovation$50K–$100K
Midcities Wound CareNorth Richland Hills, TX8501 Mid-Cities Blvd #1002,400 sq ftRenovation$50K–$100K
Farma Keio Retina CenterRichardson, TX4951 Long Prairie Rd4,500 sq ftTenant Finish-Out2025$25K–$50K
QuikMedRichardson, TX818 Metro Media Place1,700 sq ftRenovation$25K–$50K

From the Harrison Construction project records. Sizes are the leased or built area of the space. Contract is the range of the contract value, never the amount; a blank means the office has not added it yet.

Why Harrison

Why owners choose Harrison for dental and medical office construction in Dallas

Since 2011

Restaurants, finish-outs and medical offices, built here

Founded in Fort Worth by Lonnie Harrison, who has more than 25 years in construction. 190 completed projects on record in 8 states, for Firehouse Subs, Sonic, Five Guys, Taco Cabana, Starbucks, El Pollo Loco and 7-Eleven, among 73 brands.

Bonded and insured

Licensed in Texas and 29 other states

What a landlord, a lender and a franchise brand ask for first, with a ground-up division and a finish-out team under one roof.

You always know where it stands

Meetings, reports, changes priced first

Regular progress meetings and electronic project reports from the site visit to the punch list. A change is priced and approved before it is built.

FAQ

Questions about dental and medical office construction in Dallas

All questions and answers

Which general contractor should a dentist hire for a new office in Dallas?

One with dental offices on its client list that coordinates with your equipment supplier early and estimates the space before you sign. Brident Dental and Cool Smiles Dental are on Harrison Construction’s client list.

Who does medical office finish-outs in Dallas?

Harrison Construction finishes out and renovates medical offices in the Dallas area. Records include the Farma Keio Retina Center finish-out and a QuikMed renovation in Richardson.

Can you build in a medical office building with other tenants open?

Yes. We follow the building’s rules for hours, deliveries and shared systems, contain dust and noise, and schedule disruptive work after hours where the scope allows.

How much does a dental office build-out cost in Dallas?

It depends on the number of operatories, the equipment, the condition of the suite and the finishes. We do not quote a figure per square foot without seeing the space; a conceptual estimate in pre-construction gives you a real number.

Can a practice stay open during a remodel or expansion in Dallas?

Often, with phasing and after-hours work; it depends on the scope and the space. We plan it with you before pricing.

Do you build surgery centers near Dallas?

Grayson County Surgery Center, Lewisville Surgery Center and McKinney Orthopedic Surgery Center are on our client list. See the surgery center construction page.

Restaurant interior with wood screens and daylight
Discuss your project

Planning a dental or medical office in Dallas?

Planning a new location, build-out, renovation or commercial development? Tell us about your project and we’ll help identify the next step.

What to send us

The address, the lease or letter of intent, any drawings or the brand’s prototype set, and the date you need to open. Not all of it is needed to start the conversation.

Email office@harrisonconstructionteam.com or call (817) 988-0242.

CallDiscuss your project