Harrison ConstructionFort Worth, Texas
  1. Home
  2. Industries
  3. Medical & Dental Construction
  4. Surgery Centers
Surgery centers

Surgery center construction in Dallas–Fort Worth

Harrison Construction builds medical space in Dallas–Fort Worth and Texas, including ambulatory surgery centers. Grayson County Surgery Center, Lewisville Surgery Center and McKinney Orthopedic Surgery Center are on our client list, and before he founded the company in 2011, Lonnie Harrison spent five years in medical construction with a general contractor.

  • Three surgery centers on our client list
  • Dental and medical offices on record
  • Fully bonded and insured
A corridor in a modern medical building

Who builds out surgery centers in DFW?

A surgery center is one of the most demanding interiors a general contractor builds. Operating rooms, pre-op and recovery, sterile processing, medical gas, emergency power and the air system all have to work together, and the facility is inspected and surveyed before the first patient is treated. The contractor you want has built medical space before and brings its mechanical, electrical and plumbing subcontractors into the planning early.

Harrison Construction’s client list includes three surgery centers: Grayson County Surgery Center, Lewisville Surgery Center and McKinney Orthopedic Surgery Center. Medical and dental offices are on our project records as well, listed in the table below.

What is different about building a surgery center

Most of the difference is behind the walls and above the ceiling. The design team sets the requirements; the contractor’s job is to price them correctly, build them in the right order and show at the end that they perform.

  • Air and pressureoperating and sterile rooms have their own requirements for filtration, air changes, temperature, humidity and pressure between rooms. The mechanical system is designed and tested to them.
  • Medical gas and vacuumpiped by installers qualified for that work, then tested and certified before use.
  • Poweremergency power for the systems the design calls for, and electrical work coordinated with every piece of medical equipment.
  • Finishesfloors, walls and ceilings in clinical rooms chosen so they can be cleaned, with the seams and details the infection-control plan depends on.
  • Equipmentlights, booms, sterilizers and imaging are coordinated with the suppliers before rough-in, because each one sets structure, power, plumbing and wall backing.
  • Inspections and licensingcity inspections and the certificate of occupancy, plus the state licensing and accreditation surveys the owner’s team leads. We build to the approved drawings and supply the test reports and close-out documents those surveys ask for.

Start with pre-construction

A surgery center is the wrong project to price from a floor plan. In pre-construction we review the suite or the site with the design team, prepare a conceptual estimate, look for value-engineering options that do not touch clinical requirements, review the drawings for constructability and build a development schedule that carries the permit, the long-lead equipment and the inspections.

That is also when the largest risks are found: a building whose structure, roof or electrical service cannot carry the mechanical and power loads, or a shell delivered in a different condition than the lease says.

Working next to patients

An expansion or a remodel inside an operating medical building is planned around the people already there. Dust and noise are contained, work that affects shared systems is scheduled with the building, and phasing is agreed with the practice before pricing, so the cost of working that way is in the bid.

Who you work with

Lonnie Harrison, President, founded the company in Fort Worth in 2011. Alex Lioumis, VP of Operations, oversees project execution, field personnel and subcontractors, and Anne Hickey coordinates schedules and documentation. You get regular progress meetings and electronic project reports through close-out.

Related: Dental and medical office construction · Dental and medical offices in Dallas · Preconstruction services in Fort Worth · Commercial general contractor in Fort Worth.

I would be elated to work with Mr Harrison on future projects as I only expect successful and positive outcomes in large part to the direction and effort that Mr. Harrison brings to the project team.
Mike MorganM2 Engineering LLC
On record

6 dental and medical projects on record

The three surgery centers are on the company’s client list and are not part of this dated list. Dental and medical finish-outs and renovations from the Harrison Construction project records: Nick Ritter Medical Office Building, QT Quik Med, Midcities Wound Care, Farma Keio Retina Center, QuikMed and Kool Smiles, in Richardson, Midland, North Richland Hills and Hurst, contracts ranging from $25,000–$50,000 to $100,000–$250,000.

All projects on record
ProjectCityAddressSizeWorkCompletedContract
Nick Ritter Medical Office BuildingHurst, TX615 HarwoodRenovation$100K–$250K
QT Quik MedNorth Richland Hills, TX8501 Mid-Cities Blvd #3002,400 sq ftRenovation$50K–$100K
Midcities Wound CareNorth Richland Hills, TX8501 Mid-Cities Blvd #1002,400 sq ftRenovation$50K–$100K
Farma Keio Retina CenterRichardson, TX4951 Long Prairie Rd4,500 sq ftTenant Finish-Out2025$25K–$50K
QuikMedRichardson, TX818 Metro Media Place1,700 sq ftRenovation$25K–$50K
Kool SmilesMidland, TX1000 N Midkiff Rd10,000 sq ftTenant Finish-Out

From the Harrison Construction project records. Sizes are the leased or built area of the space. Contract is the range of the contract value, never the amount; a blank means the office has not added it yet.

Why Harrison

Why owners choose Harrison for surgery center construction

Since 2011

Restaurants, finish-outs and medical offices, built here

Founded in Fort Worth by Lonnie Harrison, who has more than 25 years in construction. 190 completed projects on record in 8 states, for Firehouse Subs, Sonic, Five Guys, Taco Cabana, Starbucks, El Pollo Loco and 7-Eleven, among 73 brands.

Bonded and insured

Licensed in Texas and 29 other states

What a landlord, a lender and a franchise brand ask for first, with a ground-up division and a finish-out team under one roof.

You always know where it stands

Meetings, reports, changes priced first

Regular progress meetings and electronic project reports from the site visit to the punch list. A change is priced and approved before it is built.

FAQ

Questions about surgery center construction

All questions and answers

Who builds out surgery centers in DFW?

Harrison Construction, a Fort Worth commercial general contractor since 2011, builds medical space in Dallas–Fort Worth. Lewisville Surgery Center, McKinney Orthopedic Surgery Center and Grayson County Surgery Center are on its client list.

Which contractors build ambulatory surgery centers in Texas?

Choose a general contractor with surgery centers on its client list and medical offices on its project records, that starts with pre-construction. Harrison Construction has both and works across Dallas–Fort Worth and Texas.

Do you handle the state licensing of a surgery center?

No. Licensing and accreditation are led by the owner and its consultants. We build to the approved drawings and provide the test reports, certifications and close-out documents the surveys require.

How much does a surgery center cost to build?

It depends on the building, the number of operating rooms, the mechanical and electrical systems and the equipment. We do not quote a figure without drawings; a conceptual estimate in pre-construction gives you a real number.

Can you convert an existing space into a surgery center?

Sometimes. It depends on whether the structure, roof, ceiling height and electrical service can carry the mechanical and power requirements. We check that in pre-construction, before you commit to the space.

Do you also build dental and medical offices?

Yes. Dental offices, medical offices and clinics are part of our work. See the dental and medical office construction page.

Restaurant interior with wood screens and daylight
Discuss your project

Planning a surgery center?

Planning a new location, build-out, renovation or commercial development? Tell us about your project and we’ll help identify the next step.

What to send us

The address, the lease or letter of intent, any drawings or the brand’s prototype set, and the date you need to open. Not all of it is needed to start the conversation.

Email office@harrisonconstructionteam.com or call (817) 988-0242.

CallDiscuss your project