Harrison ConstructionFort Worth, Texas
  1. Home
  2. Projects
  3. Brident Dental & Orthodontics
Medical & Dental · Dental office in a retail center

Brident Dental & Orthodontics

A Brident Dental & Orthodontics office in a retail center, with the brand’s storefront and signage.

Brident Dental and Orthodontics storefront in a retail center

About this project

The photo shows a Brident Dental & Orthodontics office in a retail center: the brand’s storefront with its sign, awnings over the entrance and window graphics, in an in-line suite with parking at the door.

Brident Dental is one of the dental clients on the Harrison Construction client list, with Cool Smiles Dental and three surgery centers. A dental office in a retail suite is a tenant finish-out built around the equipment: each operatory has its own plumbing, vacuum, compressed air and electrical, and the imaging rooms have requirements of their own.

Harrison builds medical & dental projects as tenant finish-outs, freestanding buildings and remodels, with pre-construction first. More about medical & dental construction.

What a build like this involves

  1. Operatory layout with the plumbing, vacuum, compressed air and electrical for each chair
  2. Sterilization, lab, imaging and consultation rooms, with the shielding imaging equipment requires
  3. Reception, waiting area, restrooms and staff areas planned around patient flow and accessibility
  4. Mechanical and acoustic separation between treatment rooms
  5. Coordination with the dental equipment supplier, permits with the city and the final inspections
Why it matters to the ownerA dental office is built around the equipment: every chair has its own utilities, and the supplier’s drawings set the rough-in. Coordinating that before walls go up is what keeps a practice’s opening date.
Client
Brident Dental
Industry
Medical & Dental
Format
Dental office in a retail center
I would be elated to work with Mr Harrison on future projects as I only expect successful and positive outcomes in large part to the direction and effort that Mr. Harrison brings to the project team.
Mike MorganM2 Engineering LLC
Photos

Project photography

1 photo · click to enlarge

Photos from the Harrison Construction project gallery. More photos and the project facts are added as the owner confirms them.

Why Harrison

Why owners choose Harrison for a medical & dental project

Since 2011

Restaurants, finish-outs and medical offices, built here

Founded in Fort Worth by Lonnie Harrison, who has more than 25 years in construction. 190 completed projects on record in 8 states, for Firehouse Subs, Sonic, Five Guys, Taco Cabana, Starbucks, El Pollo Loco and 7-Eleven, among 73 brands.

Bonded and insured

Licensed in Texas and 29 other states

What a landlord, a lender and a franchise brand ask for first, with a ground-up division and a finish-out team under one roof.

You always know where it stands

Meetings, reports, changes priced first

Regular progress meetings and electronic project reports from the site visit to the punch list. A change is priced and approved before it is built.

FAQ

Questions about a project like Brident Dental & Orthodontics

All questions and answers

Does Harrison Construction build dental offices?

Yes. Brident Dental and Cool Smiles Dental are on our client list, with the Lewisville Medical Office Building and the Grayson County, Lewisville and McKinney Orthopedic surgery centers.

Can you build a dental office in a retail center?

Yes. Retail suites are common for dental and orthodontic practices. We read the landlord’s delivery condition, coordinate with your equipment supplier and plan the operatories, sterilization and imaging before rough-in.

Can you add operatories to a practice that stays open?

Often, with phasing and after-hours work; it depends on the layout. We plan it with you before pricing.

Are you bonded and insured?

Yes. Harrison Construction is fully bonded and insured, and licensed in Texas and 29 other states.

How do I get a price for a project like this?

Send the address, the lease or the site status, any drawings or the brand’s prototype and the date you need to open. We visit the site, review the documents and come back with a conceptual estimate, value-engineering options and a schedule.

Restaurant interior with wood screens and daylight
Discuss your project

Planning a medical & dental project like this one?

Planning a new location, build-out, renovation or commercial development? Tell us about your project and we’ll help identify the next step.

What to send us

The address, the lease or letter of intent, any drawings or the brand’s prototype set, and the date you need to open. Not all of it is needed to start the conversation.

Email office@harrisonconstructionteam.com or call (817) 988-0242.

CallDiscuss your project