
About this project
The photo shows a freestanding Dillas Quesadillas: the curved parapet with the brand’s sign, a standing-seam metal canopy over the entrance, teal trim, a glass storefront on the front and side, and the parking lot at the door.
Dillas Quesadillas is one of the restaurant brands on the Harrison Construction client list. A small freestanding restaurant like this combines site work, a compact structure and a full quick-service kitchen, with the brand’s exterior details built as part of the envelope.
Harrison builds restaurants & qsr projects as tenant finish-outs, freestanding buildings and remodels, with pre-construction first. More about restaurants & qsr construction.
What a build like this involves
- Site work: grading, utilities to the building, paving, drive lanes and the patio slab
- Foundation, structure and the building envelope, including the brand’s signature elements such as a sign tower or canopy
- The full restaurant interior: kitchen rough-in, hood and fire suppression, grease interceptor, walk-in coolers, dining room finishes and restrooms
- Storefront glazing, exterior lighting, signage and the patio
- Permits with the city, the health authority review and the final inspections through the certificate of occupancy
Dillas Quesadillas locations on record
Harrison Construction has completed 8 Dillas Quesadillas projects on record, in Denton, Forney, Frisco, McKinney, Nacogdoches, Plano and Ruston (Texas and Louisiana): renovations, tenant finish-outs and ground-up buildings, contracts ranging from $100,000–$250,000 to $1 million–$2 million, from 1,400 to 3,200 sq ft.
| City | Address | Size | Work | Completed | Contract |
|---|---|---|---|---|---|
| Denton, TX | 1715 S Loop 288 Suite 100 | 2,800 sq ft | Renovation | $100K–$250K | |
| Forney, TX | 303 Marketplace Blvd | 2,950 sq ft | Tenant Finish-Out | $250K–$500K | |
| Frisco, TX | 2055 University Dr | 3,000 sq ft | Ground-Up | $1M–$2M | |
| Frisco, TX | 3930 Preston Rd. #140 | 2,800 sq ft | Tenant Finish-Out · Drive-thru expansion | 2017 | $500K–$1M |
| McKinney, TX | 3510 W University, Suite 102 | 2,200 sq ft | Tenant Finish-Out | 2018 | $250K–$500K |
| Nacogdoches, TX | 2829 N. Street | 2,650 sq ft | Renovation | 2025 | $250K–$500K |
| Plano, TX | 2008 Midway Rd | 3,200 sq ft | Tenant Finish-Out | $250K–$500K | |
| Ruston, LA | 1003 Cooktown Rd | 1,400 sq ft | Ground-Up | 2024 | $500K–$1M |
The photos on this page are from one of these locations; the office is matching photos to addresses.
- Client
- Dillas Quesadillas
- Industry
- Restaurants & QSR
- Format
- Freestanding restaurant
- Location
- 8 locations in 7 cities
- Project type
- Renovation, Tenant Finish-Out and Ground-Up
- Completed
- 2017 to 2025
- Contract range
- $100K–$250K to $1M–$2M
- Services for this type
- Commercial renovations, Tenant finish-outs, Ground-up construction
Lonnie helped me bring in project after project, on time and under budget. He takes pride in his finished product so he hires the right people for his team and then places them in the correct job position.
Project photography
Photos from the Harrison Construction project gallery. More photos and the project facts are added as the owner confirms them.
Why owners choose Harrison for a restaurants project
Restaurants, finish-outs and medical offices, built here
Founded in Fort Worth by Lonnie Harrison, who has more than 25 years in construction. 190 completed projects on record in 8 states, for Firehouse Subs, Sonic, Five Guys, Taco Cabana, Starbucks, El Pollo Loco and 7-Eleven, among 73 brands.
Licensed in Texas and 29 other states
What a landlord, a lender and a franchise brand ask for first, with a ground-up division and a finish-out team under one roof.
Meetings, reports, changes priced first
Regular progress meetings and electronic project reports from the site visit to the punch list. A change is priced and approved before it is built.
Do you build small freestanding restaurants?
Yes. Small quick-service buildings on pad sites are part of our ground-up work, from the site work to the kitchen and the dining room.
Do you build for regional and growing brands?
Yes. Regional brands such as Dillas Quesadillas, Snappy Salads and Gather Kitchen are on our client list alongside national brands.
Are you bonded and insured?
Yes. Harrison Construction is fully bonded and insured, and licensed in Texas and 29 other states.
How do I get a price for a project like this?
Send the address, the lease or the site status, any drawings or the brand’s prototype and the date you need to open. We visit the site, review the documents and come back with a conceptual estimate, value-engineering options and a schedule.
More from the gallery

Planning a restaurants project like this one?
Planning a new location, build-out, renovation or commercial development? Tell us about your project and we’ll help identify the next step.
What to send us
The address, the lease or letter of intent, any drawings or the brand’s prototype set, and the date you need to open. Not all of it is needed to start the conversation.
Email office@harrisonconstructionteam.com or call (817) 988-0242.






