Harrison ConstructionFort Worth, Texas
  1. Home
  2. Projects
  3. El Pollo Loco
Restaurants & QSR · Freestanding restaurant with patio

El Pollo Loco

A freestanding El Pollo Loco restaurant with stone veneer, patio umbrellas and the brand’s tile accents.

El Pollo Loco restaurant exterior with stone veneer and red patio umbrellas

About this project

The photo shows a freestanding El Pollo Loco: dark stone veneer and brick, the brand’s sign and its patterned tile band over the entrance, a fenced patio with red umbrellas, and the corner of the building toward the drive lane, photographed after rain.

El Pollo Loco is one of the restaurant brands on the Harrison Construction client list. A building like this is a ground-up project: the pad, the structure, the kitchen and the dining room, the patio and the drive lane, built to the brand’s prototype and the city’s requirements.

Harrison builds restaurants & qsr projects as tenant finish-outs, freestanding buildings and remodels, with pre-construction first. More about restaurants & qsr construction.

What a build like this involves

  1. Site work: grading, utilities to the building, paving, drive lanes and the patio slab
  2. Foundation, structure and the building envelope, including the brand’s signature elements such as a sign tower or canopy
  3. The full restaurant interior: kitchen rough-in, hood and fire suppression, grease interceptor, walk-in coolers, dining room finishes and restrooms
  4. Storefront glazing, exterior lighting, signage and the patio
  5. Permits with the city, the health authority review and the final inspections through the certificate of occupancy
Why it matters to the ownerA freestanding restaurant is a full building: more parties, more permits and a longer lead than a finish-out. One team that runs the site, the shell and the interior together keeps one schedule and one point of accountability from the first survey to opening day.

El Pollo Loco locations on record

Harrison Construction has completed 8 El Pollo Loco projects on record, in Arlington, Bedford, Dallas, Grand Prairie, Hurst, Irving and Watauga: ground-up buildings and renovations, contracts ranging from $100,000–$250,000 to $1 million–$2 million, every location 3,150 sq ft.

CityAddressSizeWorkCompletedContract
Arlington, TX4911 S Cooper St3,150 sq ftGround-Up
Bedford, TX1900 Central Rd3,150 sq ftGround-Up
Dallas, TX9455 Forest Lane3,150 sq ftRenovation$100K–$250K
Grand Prairie, TX2125 N State Hwy 3603,150 sq ftGround-Up
Grand Prairie, TX2660 S HWY 1613,150 sq ftGround-Up2018$1M–$2M
Hurst, TX1245 W Pipeline Rd3,150 sq ftGround-Up
Irving, TX2137 Estrada Pkwy3,150 sq ftGround-Up
Watauga, TX7900 Denton Hwy3,150 sq ftRenovation$250K–$500K

The photos on this page are from one of these locations; the office is matching photos to addresses.

Client
El Pollo Loco
Industry
Restaurants & QSR
Format
Freestanding restaurant with patio
Location
8 locations in 7 cities
Project type
Ground-Up and Renovation
Completed
2018
Contract range
$100K–$250K to $1M–$2M
Lonnie helped me bring in project after project, on time and under budget. He takes pride in his finished product so he hires the right people for his team and then places them in the correct job position.
Jerrel DentonFranchise Sales
Photos

Project photography

1 photo · click to enlarge

Photos from the Harrison Construction project gallery. More photos and the project facts are added as the owner confirms them.

Why Harrison

Why owners choose Harrison for a restaurants project

Since 2011

Restaurants, finish-outs and medical offices, built here

Founded in Fort Worth by Lonnie Harrison, who has more than 25 years in construction. 190 completed projects on record in 8 states, for Firehouse Subs, Sonic, Five Guys, Taco Cabana, Starbucks, El Pollo Loco and 7-Eleven, among 73 brands.

Bonded and insured

Licensed in Texas and 29 other states

What a landlord, a lender and a franchise brand ask for first, with a ground-up division and a finish-out team under one roof.

You always know where it stands

Meetings, reports, changes priced first

Regular progress meetings and electronic project reports from the site visit to the punch list. A change is priced and approved before it is built.

FAQ

Questions about a project like El Pollo Loco

All questions and answers

Does Harrison Construction build El Pollo Loco restaurants?

El Pollo Loco is on the Harrison Construction client list, and the freestanding restaurant in this photo is from our project gallery. Ask us about the location you are planning.

Do you adapt a brand’s prototype to a specific site?

Yes. Constructability review in pre-construction adapts the prototype to the lot, the grade, the utilities and the city’s requirements before permits.

Are you bonded and insured?

Yes. Harrison Construction is fully bonded and insured, and licensed in Texas and 29 other states.

How do I get a price for a project like this?

Send the address, the lease or the site status, any drawings or the brand’s prototype and the date you need to open. We visit the site, review the documents and come back with a conceptual estimate, value-engineering options and a schedule.

Restaurant interior with wood screens and daylight
Discuss your project

Planning a restaurants project like this one?

Planning a new location, build-out, renovation or commercial development? Tell us about your project and we’ll help identify the next step.

What to send us

The address, the lease or letter of intent, any drawings or the brand’s prototype set, and the date you need to open. Not all of it is needed to start the conversation.

Email office@harrisonconstructionteam.com or call (817) 988-0242.

CallDiscuss your project