Harrison ConstructionFort Worth, Texas
  1. Home
  2. Projects
  3. Pizza Patrón
Restaurants & QSR · In-line storefront in a retail center

Pizza Patrón

A Pizza Patrón store with the brand’s red awning, colored pilasters and storefront graphics.

Pizza Patron storefront with red awning and colored columns

About this project

The photo shows a Pizza Patrón store in a retail center: the brand’s red awning and sign, the colored pilasters at the corner suite, window graphics, an accessible entrance and outdoor seating at the door.

Pizza Patrón is one of the restaurant brands on the Harrison Construction client list. A pizza store in a retail suite is a tenant finish-out with a serious kitchen behind a small front: ovens, hood and exhaust, the walk-in, the make line and the counter, coordinated with the landlord’s delivery condition.

Harrison builds restaurants & qsr projects as tenant finish-outs, freestanding buildings and remodels, with pre-construction first. More about restaurants & qsr construction.

What a build like this involves

  1. Review of the landlord’s delivery condition and the lease exhibits
  2. Demolition where a previous tenant left a finish-out, then walls, ceilings and the storefront
  3. Kitchen rough-in, hood and exhaust, fire suppression, grease interceptor and the equipment package
  4. Dining room finishes, counters, lighting, restrooms and the brand’s graphics
  5. Permits with the city, the health authority review and the final inspections
Why it matters to the ownerIn a tenant space the budget is decided by what is already there: utilities, the slab, the roof and the grease interceptor. A site visit and a conceptual estimate before the lease is signed are what keep the finish-out on budget.
Client
Pizza Patrón
Industry
Restaurants & QSR
Format
In-line storefront in a retail center
Lonnie helped me bring in project after project, on time and under budget. He takes pride in his finished product so he hires the right people for his team and then places them in the correct job position.
Jerrel DentonFranchise Sales
Photos

Project photography

1 photo · click to enlarge

Photos from the Harrison Construction project gallery. More photos and the project facts are added as the owner confirms them.

Why Harrison

Why owners choose Harrison for a restaurants project

Since 2011

Restaurants, finish-outs and medical offices, built here

Founded in Fort Worth by Lonnie Harrison, who has more than 25 years in construction. 190 completed projects on record in 8 states, for Firehouse Subs, Sonic, Five Guys, Taco Cabana, Starbucks, El Pollo Loco and 7-Eleven, among 73 brands.

Bonded and insured

Licensed in Texas and 29 other states

What a landlord, a lender and a franchise brand ask for first, with a ground-up division and a finish-out team under one roof.

You always know where it stands

Meetings, reports, changes priced first

Regular progress meetings and electronic project reports from the site visit to the punch list. A change is priced and approved before it is built.

FAQ

Questions about a project like Pizza Patrón

All questions and answers

Do you build pizza restaurants?

Yes. Pizza Patrón is on our client list. A pizza finish-out needs the oven, hood and exhaust routing settled with the landlord before pricing, which is part of our pre-construction.

Do you do restaurant finish-outs in strip centers?

Yes. In-line and end-cap suites in strip centers are the most common form of our restaurant work.

Are you bonded and insured?

Yes. Harrison Construction is fully bonded and insured, and licensed in Texas and 29 other states.

How do I get a price for a project like this?

Send the address, the lease or the site status, any drawings or the brand’s prototype and the date you need to open. We visit the site, review the documents and come back with a conceptual estimate, value-engineering options and a schedule.

Restaurant interior with wood screens and daylight
Discuss your project

Planning a restaurants project like this one?

Planning a new location, build-out, renovation or commercial development? Tell us about your project and we’ll help identify the next step.

What to send us

The address, the lease or letter of intent, any drawings or the brand’s prototype set, and the date you need to open. Not all of it is needed to start the conversation.

Email office@harrisonconstructionteam.com or call (817) 988-0242.

CallDiscuss your project