Optometry and eye care offices in Fort Worth and Dallas–Fort Worth are built by commercial general contractors with medical finish-outs on their records, working with the practice’s architect and its equipment supplier. Harrison Construction, a Fort Worth contractor since 2011, finished out the 4,500 sq ft Farma Keio Retina Center in Richardson in 2025. What sets an eye care office apart is the exam lane, the lighting control and the optical showroom.
- The exam lane decides the plan: its length, or the mirror or digital chart that shortens it, is set before the walls are drawn.
- Lighting is part of the clinical equipment: exam and testing rooms need dimming and control, the optical showroom needs bright, even light.
- Every lane and testing room needs power and data at fixed spots for the instruments and the practice software.
- Check the suite before you sign: the ceiling, the electrical service, the HVAC, plumbing for the lab and contact lens room, and the landlord’s work letter.
- Compare bids on the same drawings, the same equipment list and the same exclusions.
Who builds optometry and eye care offices in Fort Worth?
Most eye care offices in Fort Worth and the cities around it are finish-outs of leased space: a suite in a retail center, a medical office building or a former shop on a busy road. The work is commercial. It needs drawings from an architect, a city building permit, accessibility review and coordination with the vendor who supplies the exam chairs, stands and instruments. That is the job of a commercial general contractor, not a handyman or a residential builder.
The contractor you want has built medical space before, meets your equipment supplier before the walls are framed, and gives you a real estimate before you commit to the lease. Ask for the list of medical projects they have built, with the city, the size and the type of work, and ask who will run your job day to day.
At Harrison Construction, eye care is part of our dental and medical office construction work. In 2025 we finished out the 4,500 sq ft Farma Keio Retina Center on Long Prairie Road in Richardson. Our medical records also include a 1,700 sq ft QuikMed renovation in Richardson, two 2,400 sq ft clinic renovations in North Richland Hills (Midcities Wound Care and QT Quik Med) and a medical office building renovation in Hurst. Before he founded the company in 2011, Lonnie Harrison, our President, spent five years in medical construction with a general contractor.
What makes an eye care office different from other medical space
A general medical office is mostly exam rooms of the same size along a corridor. An eye care office has more kinds of rooms, and each one asks something different of the building. The design belongs to your architect and your equipment supplier. These are the rooms that most change the construction:
- Exam lanes. The room where the doctor examines the patient, with the chair, the stand, the slit lamp, the phoropter and the chart. Its length and its lighting are set by the testing method.
- Pre-testing. A room or a bay where staff run the first tests before the patient sees the doctor. Several instruments on tables, each with power and data.
- Special testing rooms. Rooms for visual fields, retinal imaging and scans. Many of these need low, controlled light and a quiet room.
- The optical showroom. The retail part of the practice: frame boards, display cases, fitting tables and a dispensing counter, lit like a store.
- The lab. Where lenses are edged and glasses are assembled or adjusted, if the practice does that in house. Power, a sink and ventilation as the equipment requires.
- The contact lens room. A sink, a mirror and good light for teaching patients to put in and take out lenses.
- Retina and procedure rooms. For retina and medical eye practices, rooms for injections and minor procedures, with the cleanable finishes and the hand sinks those rooms need.
Each of these changes something behind the walls or above the ceiling. That is why the price for an eye care office is real only after the room list and the equipment list are settled.
The exam lane: the room that sets the plan
The exam lane is the room the rest of the office is planned around. A traditional lane is long enough for the patient to read a chart at the testing distance. Many practices now shorten the room with a mirror system or a digital chart that is calibrated for a shorter distance. Which one you use is a decision for the doctor and the equipment supplier, and it changes the room size, so it comes first.
Once the lane size is set, the rest follows. The number of lanes sets the length of the clinical corridor. The position of the chair and the stand sets where power and data come out of the floor or the wall. The chart position sets where the wall needs blocking for a monitor or a projector. Changing any of these after the walls are framed costs money and time.
What each lane needs from the building
- Power at the stand and at the instruments, with enough circuits for everything that runs at once.
- Data for the practice software, the chart and any imaging that sends results to the record.
- Lighting the doctor controls from the chair: dimmable, with the switch where the doctor can reach it.
- Blocking in the wall for the chart monitor, the mirror or other wall-mounted equipment.
- Sound separation from the corridor and the next lane, so the conversation stays private.

Eye care rooms and what each one needs
The table lists the rooms in a typical optometry or eye care office, what the room does and what it asks of the construction. Your architect’s plan and your supplier’s equipment list decide the final answer for your practice.
What each room in an eye care office asks of the build
| Room | What happens there | What the build has to provide | Settle before |
|---|---|---|---|
| Exam lane | Eye exam with chair, stand, slit lamp and chart | Room length or a mirror/digital chart, power and data at the stand, dimmable light, wall blocking, sound separation | Framing |
| Pre-testing | First tests by staff on several instruments | Power and data at each instrument table, enough circuits, low glare light | Electrical rough-in |
| Special testing and imaging | Visual fields, retinal photos and scans | Low, controlled light, power and data, a quiet room, cooling for the equipment | Electrical and HVAC design |
| Optical showroom | Frame selection, fitting and dispensing | Bright, even display lighting, power in the display walls and cases, a dispensing counter | Casework and lighting plan |
| Lab | Edging lenses, assembling and adjusting glasses | Power for the edger, water and a drain where the equipment needs them, ventilation | Plumbing rough-in |
| Contact lens room | Teaching lens insertion and care | A sink, a mirror, good light and a counter | Plumbing rough-in |
| Procedure room (retina and medical practices) | Injections and minor procedures | Hand sink, cleanable finishes, power and data, lighting the doctor needs | Plumbing and finish schedule |
How to read this table: the last column is the point in the build after which a change gets expensive. If a room on your list is not settled by then, say so in pre-construction, and we price it as an allowance instead of guessing.
Lighting, power and cooling
In most offices, lighting is a finish. In an eye care office it is part of the clinical work. Exam lanes and testing rooms need light the doctor can dim and control, while the optical showroom needs bright, even light that shows frames and faces well. The two areas are usually on separate controls, and the lighting plan is drawn with the architect early, not picked from a catalog at the end.
Power is the other surprise. A practice with several lanes, a pre-testing room, imaging and an edger can need more circuits than the suite was built with. Older retail suites in particular may have a small electrical service. We check the panel and the service on site before you sign the lease, so an upgrade is in the estimate rather than a change order.
Imaging equipment and the server give off heat, and testing rooms are small and closed. The HVAC has to keep them comfortable with the doors shut. On a second-generation suite, the age and size of the rooftop units and how the ductwork reaches the new rooms are part of the site visit.
What to check before you sign the lease
Most surprises in a medical finish-out come from the space, not the design. These are the items we check in pre-construction, ideally with your equipment supplier’s first layout in hand:
- Shape and depth of the suite. Whether the exam lanes fit the testing method you want, and how many lanes the suite can hold.
- Electrical service. Whether the panel and the service can carry the lanes, the testing rooms, imaging, the edger and the HVAC.
- HVAC. The size and age of the rooftop units and whether the closed testing rooms can be cooled.
- Plumbing. Where the sewer and water run, for the lab, the contact lens room, the restrooms and any procedure room.
- Ceiling height. Room above the ceiling for ducts, lighting and data.
- Storefront and parking. Visibility for the optical, an accessible route from parking and signage the landlord allows.
- The work letter. What the landlord delivers, what the tenant improvement allowance covers and what is left to the practice.
If the space was a medical office before, some of it may be reusable. Our guide to how long a tenant finish-out takes explains which phases decide the opening date.
Permits and accessibility in Fort Worth and Texas
An eye care office needs a commercial building permit from the city where it opens. Your architect prepares the drawings, and we take them through the city review with them, then schedule the inspections and the certificate of occupancy. In Fort Worth that runs through the City of Fort Worth’s development services; Southlake, Keller, Arlington and the other cities each run their own review, so the permit is on the schedule from the first week.

Accessibility is reviewed separately. Texas requires an accessibility review by a registered accessibility specialist for larger commercial projects, through the Texas Department of Licensing and Regulation, and an inspection after completion. The entrance, the routes, the check-in and dispensing counters, at least one exam lane and the restrooms are designed to the Texas Accessibility Standards.

Remodeling or adding lanes to an open practice
A practice that adds lanes, moves the optical or remodels usually cannot close. We plan the phases with you before pricing, so the cost of working that way is in the bid. Noisy and dusty work goes after hours or on days the office is closed where the scope allows, work areas are sealed off from patients, and the lanes that stay open keep their power, data and lighting.
For a second location, what worked in the first office, from the lane layout to the showroom casework, is reused and priced early. Our commercial renovation work covers remodels of practices that stay open, and our guide to the dental office build-out shows how a similar equipment-led office is planned.
How Harrison Construction builds an eye care office
Every project starts with pre-construction: due diligence on the suite, a conceptual estimate, value engineering, a constructability review, a development schedule, bidding, subcontractor qualification and permitting. During construction we manage the budget, the schedule, the subcontractors, quality control and safety, with regular progress meetings and electronic project reports, and we close out with the punch list, the final inspections and the close-out documents.
We are fully bonded and insured, licensed in Texas and 29 other states, and we work across Fort Worth, Dallas–Fort Worth and Texas from our office in north Fort Worth, including Southlake, Keller and the rest of northeast Tarrant County.

If you are planning an optometry or eye care office, send the address, the lease status and your equipment supplier’s first layout through our contact page, or call (817) 988-0242. We come back with what the space will take and the next step.
Questions owners ask
Who builds optometry offices in Fort Worth and Southlake?
Commercial general contractors with medical finish-outs on their records, working with the practice’s architect and equipment supplier. Harrison Construction, a Fort Worth contractor since 2011, finished out the 4,500 sq ft Farma Keio Retina Center in Richardson in 2025 and builds medical offices across Fort Worth, Southlake and Dallas–Fort Worth.
How much does an optometry office build-out cost?
It depends on the number of exam lanes, the testing rooms, the optical showroom, the lab, the condition of the suite and the finishes. We do not quote a figure per square foot without seeing the space; a conceptual estimate in pre-construction gives you a real number.
How long does an exam lane need to be?
It depends on the testing method. A traditional lane is long enough for the chart distance; a mirror system or a calibrated digital chart allows a shorter room. The doctor and the equipment supplier decide, and the decision comes before the walls are drawn.
Can an eye care office go in a retail center?
Yes, and many do, because the optical showroom benefits from a storefront. Check the electrical service, the HVAC, the plumbing routes and the landlord’s work letter before you sign.
Do you work with our equipment supplier?
Yes. The supplier’s layout sets the power, data, lighting and blocking in each lane and testing room, so we coordinate with them before rough-in and during the equipment installation.
Can you add exam lanes while we keep seeing patients?
Often, with phasing and after-hours work; it depends on the scope. We plan the phases with you before pricing and keep the lanes that stay open running.