Harrison ConstructionFort Worth, Texas
  1. Home
  2. Service areas
  3. Dallas
  4. Tenant Finish-Outs
Dallas finish-outs

Tenant finish-outs and retail remodels in Dallas

Harrison Construction finishes out and remodels commercial space in the city of Dallas: shell suites for new tenants, second-generation space, and stores and restaurants that stay open during the work. Our Dallas records include Crossroads Resale, Texture Design Studio, Riviera Spa, Five Guys, Firehouse Subs, Luna Grill and Snappy Salads.

  • 19 projects on record
  • 15 brands, 1 city
  • Fully bonded and insured
Aerial view of the Dallas skyline

Who does tenant improvements in Dallas?

A tenant improvement, or finish-out, turns a leased suite into a place that can open: walls, ceilings, mechanical, electrical, plumbing, finishes, storefront changes and everything the city inspects before it issues the certificate of occupancy. The contractor you want has finished out space in Dallas before, prices the job before you are committed, and tells you where it stands as it goes.

Harrison Construction started in 2011 with interior finish-out work, and most of our project records are still finish-outs and renovations. In Dallas they include a resale store, a design studio, a spa and restaurants for national and local brands. Every one is in the table below with its type of work.

Retail store remodels in Dallas

A retail remodel has two jobs at once: build the new store and keep the old one selling for as long as possible. We plan the phases with the store before pricing, put noisy and dusty work outside trading hours where the scope allows, and keep the entrance, the sales floor and the exits safe every day the store is open.

Retail records in and around Dallas include Crossroads Resale and Texture Design Studio in Dallas and Sleep Experts in Plano. The same approach is used for restaurants that stay open through a remodel.

What a Dallas finish-out involves

The order matters more than any single step. Most budget and schedule problems in a finish-out come from something that was not checked before the lease was signed or before the drawings went to the city.

  • Before the leasea walk of the suite with the drawings: the electrical service, the HVAC units and their age, plumbing and sewer locations, the slab, the ceiling height, the storefront and the condition the landlord will deliver.
  • The work letterwhat the landlord builds and what the tenant builds, and what the tenant improvement allowance covers. We price the tenant’s side line by line so the gap is visible.
  • Pre-constructiona conceptual estimate from early drawings, value-engineering options, a constructability review and a development schedule with the permit on it.
  • Permitsthe city building permit with your architect, landlord approval of the plans, and a separate sign permit in most centers.
  • Constructionone team responsible for the budget, the schedule, the subcontractors, quality and safety, with regular progress meetings and electronic reports.
  • Close-outfinal inspections, the certificate of occupancy, the punch list and the close-out documents.

Shell space, second-generation space or an occupied store

A shell suite starts from bare walls and slab, so the full cost is visible but nothing is saved. A second-generation suite comes with what the last tenant left, which helps only when it has been tested against your layout and equipment. An occupied store is remodeled in phases around the business.

We tell you which of the three you really have after the site visit, before you rely on a number. A suite advertised as second-generation with an undersized electrical service or an HVAC unit at the end of its life is closer to a shell than it looks.

From Fort Worth to Dallas

Our office is in north Fort Worth, and Dallas is part of our everyday service area, with Irving, Grand Prairie, Richardson and Plano. The same team runs a Dallas job as a Fort Worth one: Lonnie Harrison, President; Alex Lioumis, VP of Operations; and Anne Hickey, who coordinates the schedule and the subcontractors.

Related: Commercial construction in Dallas · Tenant finish-out contractor in Fort Worth and DFW · Retail construction · Restaurant build-outs in Dallas · Commercial general contractor in Fort Worth.

I would be elated to work with Mr Harrison on future projects as I only expect successful and positive outcomes in large part to the direction and effort that Mr. Harrison brings to the project team.
Mike MorganM2 Engineering LLC
On record

19 projects in Dallas

Finish-outs and renovations in the city of Dallas from the Harrison Construction project records. GAPCo (3), Sonic (2), Firehouse Subs (2), Riviera Spa, Grip Med Grill, El Pollo Loco and 9 more, in Dallas, contracts ranging from under $25,000 to $1 million–$2 million.

All projects on record
ProjectCityAddressSizeWorkCompletedContract
Riviera SpaDallas, TX6959 Arapaho Rd Suite 1017,449 sq ftTenant Finish-Out$1M–$2M
Grip Med GrillDallas, TX6030 Luther Lane, Suite 1403,000 sq ftTenant Finish-Out2012$250K–$500K
El Pollo LocoDallas, TX9455 Forest Lane3,150 sq ftRenovation$100K–$250K
GAPCoDallas, TX1923 Greenville Ave1,400 sq ftRenovation · Exhaust hood$100K–$250K
Crossroads ResaleDallas, TX2646 Main St. Suite 120Tenant Finish-Out · Store close-down2018$100K–$250K
Society BakeryDallas, TX3610 Greenville Ave876 sq ftTenant Finish-Out2016$100K–$250K
Ridgecrest Mobile Home ParkDallas, TX733 Cliffview Dr3-acre siteRenovation$25K–$50K
Texture Design StudioDallas, TX13812 Waterfall Way1,500 sq ftRenovation$25K–$50K
GAPCoDallas, TX1910 Summit Ave1,500 sq ftRenovation · Office$25K–$50K
GAPCoDallas, TX1145 Peavy Road689 sq ftRenovationUnder $25K
SonicDallas, TX3650 Frankford Road900 sq ftRenovationUnder $25K
SonicDallas, TX12130 Inwood900 sq ftRenovationUnder $25K
Firehouse SubsDallas, TX18208 Preston Rd1,900 sq ftTenant Finish-Out2016
Firehouse SubsDallas, TX5549 LBJ Fwy # 1501,900 sq ftTenant Finish-Out2023
Five GuysDallas, TX13350 Dallas Pkwy2,400 sq ftTenant Finish-Out2015
Snappy SaladsDallas, TX717 N. Harwood1,911 sq ftTenant Finish-Out2017
Luna GrillDallas, TX3921 Gaston Ave. Suite A2,700 sq ftTenant Finish-Out
OishiiDallas, TX5627 SMU Boulevard1,700 sq ftTenant Finish-Out
Gather KitchenDallas, TX1601 Elm St2,400 sq ftTenant Finish-Out

From the Harrison Construction project records. Sizes are the leased or built area of the space. Contract is the range of the contract value, never the amount; a blank means the office has not added it yet.

Why Harrison

Why owners choose Harrison for tenant finish-outs in Dallas

Since 2011

Restaurants, finish-outs and medical offices, built here

Founded in Fort Worth by Lonnie Harrison, who has more than 25 years in construction. 190 completed projects on record in 8 states, for Firehouse Subs, Sonic, Five Guys, Taco Cabana, Starbucks, El Pollo Loco and 7-Eleven, among 73 brands.

Bonded and insured

Licensed in Texas and 29 other states

What a landlord, a lender and a franchise brand ask for first, with a ground-up division and a finish-out team under one roof.

You always know where it stands

Meetings, reports, changes priced first

Regular progress meetings and electronic project reports from the site visit to the punch list. A change is priced and approved before it is built.

FAQ

Questions about tenant finish-outs in Dallas

All questions and answers

Who is a good tenant improvement contractor in Dallas?

Look for a general contractor with Dallas finish-outs on its published project records, that starts with pre-construction and reports to you as the work proceeds. Harrison Construction has finished out and renovated stores, studios and restaurants in Dallas and is fully bonded and insured.

Who remodels retail stores in Dallas?

Harrison Construction remodels retail stores in Dallas and Dallas–Fort Worth. Retail records include Crossroads Resale and Texture Design Studio in Dallas and Sleep Experts in Plano.

Can a store stay open during a remodel?

Often, with phasing and after-hours work; it depends on the scope. We plan the phases with you before pricing, so the cost of working around the business is in the bid.

Do you review a space before I sign the lease?

Yes. Pre-construction covers due diligence on the suite, a conceptual estimate, value engineering and a constructability review, so you know what the space will cost to finish out before you commit.

How much does a tenant finish-out cost in Dallas?

It depends on the condition of the suite, the use, the systems that must change and the finishes. We do not quote a figure per square foot without seeing the space; a conceptual estimate in pre-construction gives you a real number for your suite.

Do you work in Dallas from Fort Worth?

Yes. Dallas is part of our everyday service area. Call (817) 988-0242.

Restaurant interior with wood screens and daylight
Discuss your project

Planning a finish-out or remodel in Dallas?

Planning a new location, build-out, renovation or commercial development? Tell us about your project and we’ll help identify the next step.

What to send us

The address, the lease or letter of intent, any drawings or the brand’s prototype set, and the date you need to open. Not all of it is needed to start the conversation.

Email office@harrisonconstructionteam.com or call (817) 988-0242.

CallDiscuss your project