Harrison ConstructionFort Worth, Texas
  1. Home
  2. Service areas
  3. Dallas
  4. Restaurant Build-Outs
Dallas restaurants

Restaurant build-outs and permitting in Dallas

Harrison Construction builds restaurants in the city of Dallas: new build-outs in shell space, conversions of second-generation restaurants and remodels of open stores. Our Dallas records include Five Guys, Firehouse Subs, Luna Grill, Snappy Salads, Grip Med Grill, Oishii, Gather Kitchen, Society Bakery, El Pollo Loco, Sonic and GAPCo.

  • 15 projects on record
  • 11 brands, 1 city
  • Fully bonded and insured
The Dallas skyline

Which general contractor should I hire for a restaurant build-out in Dallas?

Hire one that has built restaurants in Dallas, that starts with pre-construction so the budget and the permit path are known before you commit, and that tells you every week where the job stands. A restaurant has more systems in a small space than almost any other tenant, and the city, the health authority and the landlord all review it.

Harrison Construction has built restaurants in Dallas for brands from Five Guys and Firehouse Subs to local concepts such as Society Bakery and Gather Kitchen. Every project is listed below with its size and type of work.

Restaurant permitting in Dallas: what the path looks like

A restaurant build-out in Dallas goes through the city’s building permit review, and food service is reviewed separately for the health permit. The landlord reviews the plans too, often before they can be submitted. Signs usually need their own permit.

We do not guess at the city’s current review times or fees. In pre-construction we put the permit path on the project schedule with the architect, answer the review comments, schedule the inspections and keep the health and fire inspections in the right order for the certificate of occupancy.

  • Before the leasesite review: utilities, grease interceptor, hood and exhaust route, restrooms and accessibility, the landlord’s delivery condition.
  • Drawingsthe architect’s permit set, coordinated with the kitchen equipment plan and the brand’s standards.
  • Reviewslandlord approval, the city building permit, the health authority’s food service review, the sign permit.
  • Construction and inspectionsrough-in and final inspections, the hood and fire-suppression test, the health inspection before opening.
  • Certificate of occupancythen the punch list, close-out documents and the opening.

New space, second-generation space or a remodel

Most Dallas restaurant projects are one of three jobs. A new build-out in a shell suite starts from bare walls and slab. A second-generation restaurant already has a hood, a grease interceptor and plumbing, which can save work only after they are tested against your equipment. A remodel of an open restaurant is phased around the business.

Our Dallas records include all three: finish-outs for Five Guys, Firehouse Subs, Luna Grill and Snappy Salads, and renovations for El Pollo Loco, Sonic and GAPCo.

From Fort Worth to Dallas

Our office is in north Fort Worth, and Dallas is part of our everyday service area, as are Irving, Grand Prairie, Plano, Frisco, Richardson and the rest of Dallas County and Collin County. The same team runs a Dallas job as a Fort Worth one: Lonnie Harrison, Alex Lioumis, VP of Operations, and Anne Hickey, who coordinates the schedule and the subcontractors.

Related: Commercial construction in Dallas · Restaurant construction · Franchise restaurants.

I would be elated to work with Mr Harrison on future projects as I only expect successful and positive outcomes in large part to the direction and effort that Mr. Harrison brings to the project team.
Mike MorganM2 Engineering LLC
On record

15 restaurant projects in Dallas

Restaurant projects in the city of Dallas from the Harrison Construction project records. GAPCo (3), Sonic (2), Firehouse Subs (2), Grip Med Grill, El Pollo Loco, Society Bakery and 5 more, in Dallas, contracts ranging from under $25,000 to $250,000–$500,000.

All projects on record
ProjectCityAddressSizeWorkCompletedContract
Grip Med GrillDallas, TX6030 Luther Lane, Suite 1403,000 sq ftTenant Finish-Out2012$250K–$500K
El Pollo LocoDallas, TX9455 Forest Lane3,150 sq ftRenovation$100K–$250K
GAPCoDallas, TX1923 Greenville Ave1,400 sq ftRenovation · Exhaust hood$100K–$250K
Society BakeryDallas, TX3610 Greenville Ave876 sq ftTenant Finish-Out2016$100K–$250K
GAPCoDallas, TX1910 Summit Ave1,500 sq ftRenovation · Office$25K–$50K
GAPCoDallas, TX1145 Peavy Road689 sq ftRenovationUnder $25K
SonicDallas, TX3650 Frankford Road900 sq ftRenovationUnder $25K
SonicDallas, TX12130 Inwood900 sq ftRenovationUnder $25K
Firehouse SubsDallas, TX18208 Preston Rd1,900 sq ftTenant Finish-Out2016
Firehouse SubsDallas, TX5549 LBJ Fwy # 1501,900 sq ftTenant Finish-Out2023
Five GuysDallas, TX13350 Dallas Pkwy2,400 sq ftTenant Finish-Out2015
Snappy SaladsDallas, TX717 N. Harwood1,911 sq ftTenant Finish-Out2017
Luna GrillDallas, TX3921 Gaston Ave. Suite A2,700 sq ftTenant Finish-Out
OishiiDallas, TX5627 SMU Boulevard1,700 sq ftTenant Finish-Out
Gather KitchenDallas, TX1601 Elm St2,400 sq ftTenant Finish-Out

From the Harrison Construction project records. Sizes are the leased or built area of the space. Contract is the range of the contract value, never the amount; a blank means the office has not added it yet.

Why Harrison

Why owners choose Harrison for restaurant build-outs in dallas

Since 2011

Restaurants, finish-outs and medical offices, built here

Founded in Fort Worth by Lonnie Harrison, who has more than 25 years in construction. 190 completed projects on record in 8 states, for Firehouse Subs, Sonic, Five Guys, Taco Cabana, Starbucks, El Pollo Loco and 7-Eleven, among 73 brands.

Bonded and insured

Licensed in Texas and 29 other states

What a landlord, a lender and a franchise brand ask for first, with a ground-up division and a finish-out team under one roof.

You always know where it stands

Meetings, reports, changes priced first

Regular progress meetings and electronic project reports from the site visit to the punch list. A change is priced and approved before it is built.

FAQ

Questions about restaurant build-outs in dallas

All questions and answers

Which general contractor should I hire for a restaurant build-out in Dallas?

One with restaurant build-outs in Dallas on its project records, that starts with pre-construction and reports to you as the work proceeds. Harrison Construction’s Dallas records include Five Guys, Firehouse Subs, Luna Grill, Snappy Salads and Society Bakery.

Who handles restaurant permitting and build-out in Dallas?

Harrison Construction runs the permit path with your architect (the city building permit, the health authority’s food service review, landlord approval and the sign permit), then builds the restaurant through inspections and the certificate of occupancy.

How long does a Dallas restaurant permit take?

It depends on the city’s current review load, the completeness of the drawings and the comments. We put the permit on the project schedule in pre-construction and answer the comments with the architect.

Do you convert second-generation restaurant space in Dallas?

Yes. We test what the last tenant left (hood, fire suppression, grease interceptor, walk-in, utilities) against your equipment before you sign, and scope the remodel from that.

Can you remodel a Dallas restaurant while it stays open?

Often, with phasing and after-hours work. Our Dallas records include renovations of operating restaurants.

Do you work in Dallas from Fort Worth?

Yes. Dallas is part of our everyday service area. Call (817) 988-0242.

Restaurant interior with wood screens and daylight
Discuss your project

Planning a restaurant build-out project?

Planning a new location, build-out, renovation or commercial development? Tell us about your project and we’ll help identify the next step.

What to send us

The address, the lease or letter of intent, any drawings or the brand’s prototype set, and the date you need to open. Not all of it is needed to start the conversation.

Email office@harrisonconstructionteam.com or call (817) 988-0242.

CallDiscuss your project