- Home
- Service areas
- Denton & Lewisville
Commercial contractor in Denton and Lewisville
Harrison Construction builds in Denton County: restaurant build-outs, freestanding restaurant buildings, medical offices and commercial finish-outs in Denton, Lewisville, Flower Mound and the cities around them. Our records there include a ground-up Starbucks in Denton, Firehouse Subs and Snappy Salads in Lewisville, Luna Grill in Flower Mound and First State Bank in Denton.
- 12 projects on record
- 11 brands, 5 cities
- Fully bonded and insured

Who builds out restaurants in Denton and Lewisville?
Harrison Construction does. Restaurant build-outs are the largest part of our work, and our Denton County records include finish-outs for Grip Med Grill and Pizza Snob in Denton, Firehouse Subs and Snappy Salads in Lewisville, Luna Grill and Curry Up Now in Flower Mound and Firehouse Subs in Cross Roads, plus a Dillas Quesadillas renovation in Denton.
A restaurant has more systems in a small space than almost any other tenant: the hood and exhaust, the grease interceptor, gas, a heavy electrical load and finishes the health authority reviews. We check them against the suite in pre-construction, before the lease is final where we can, so the price you plan on is a real one.
A new restaurant building in Denton
A freestanding restaurant is a different project from a build-out. It adds the site: civil drawings, utilities, paving, drainage, the drive-thru lane and the city’s site plan review, all before the building itself.
The ground-up Starbucks in Denton on our records, pictured on this page, was that kind of project. Harrison Construction runs the site work and the building under one contract, with one schedule that carries the permits, the utility connections and the long-lead equipment.
Medical offices in Denton County
Dental and medical finish-outs are planned around equipment and patient flow: operatories or exam rooms, imaging, sterilization, ventilation and sound separation between rooms. The Lewisville Medical Office Building and the Lewisville Surgery Center are on our client list, and before he founded the company, Lonnie Harrison spent five years in medical construction with a general contractor.
Commercial build-outs: retail, banks and service businesses
Not every project is a restaurant. Denton County records include a renovation for First State Bank in Denton, a renovation for Premier One Auto Care in Lewisville and a retail finish-out for Green Vapor in Little Elm.
- Site or suite reviewutilities, the electrical service, HVAC, the slab and the condition the landlord will deliver, before you commit.
- Estimate and schedulea conceptual estimate, value-engineering options and a development schedule with the permit on it.
- Permitsthe city building permit with your architect, landlord approval and, for food service, the health authority’s review.
- Construction and close-outregular progress meetings and electronic reports, then final inspections, the certificate of occupancy and the punch list.
Close to our office
Our office is in north Fort Worth, near Interstate 35W. Denton is north of it on the same highway, and Lewisville and Flower Mound are to the east. The same team runs the job: Lonnie Harrison, President; Alex Lioumis, VP of Operations; and Anne Hickey, who coordinates the schedule and the subcontractors.
Related: Commercial contractor in Dallas–Fort Worth · North Fort Worth, Keller and Haslet · Restaurant construction · Dental and medical office construction · General contractor in Fort Worth, TX.
I would be elated to work with Mr Harrison on future projects as I only expect successful and positive outcomes in large part to the direction and effort that Mr. Harrison brings to the project team.
Built by Harrison Construction

12 projects in Denton, Lewisville and nearby
Projects in Denton, Lewisville, Flower Mound, Little Elm and Cross Roads from the Harrison Construction project records. Firehouse Subs (2), Premier One Auto Care, First State Bank, Luna Grill, Grip Med Grill, Pizza Snob and 5 more, in Flower Mound, Denton, Cross Roads, Lewisville and Little Elm, contracts ranging from $100,000–$250,000 to $500,000–$1 million.
| Project | City | Address | Size | Work | Completed | Contract |
|---|---|---|---|---|---|---|
| Premier One Auto Care | Lewisville, TX | 1901 Stemmons Freeway | 7,442 sq ft | Renovation | $500K–$1M | |
| First State Bank | Denton, TX | 400 West Oak Street | 10,000 sq ft | Renovation | 2018 | $250K–$500K |
| Luna Grill | Flower Mound, TX | 2500 Cross Timbers Rd | 3,400 sq ft | Tenant Finish-Out | 2014 | $250K–$500K |
| Grip Med Grill | Denton, TX | 1200 West Hickory Street | 3,000 sq ft | Tenant Finish-Out | 2012 | $250K–$500K |
| Firehouse Subs | Cross Roads, TX | 11750 US 380 #210 | 1,900 sq ft | Tenant Finish-Out | $250K–$500K | |
| Pizza Snob | Denton, TX | 321 W Hickory St #108 | 1,879 sq ft | Tenant Finish-Out | 2015 | $100K–$250K |
| Dillas Quesadillas | Denton, TX | 1715 S Loop 288 Suite 100 | 2,800 sq ft | Renovation | $100K–$250K | |
| Firehouse Subs | Lewisville, TX | 2325 S. Stemmons Fwy #308 | 1,900 sq ft | Tenant Finish-Out | 2015 | |
| Snappy Salads | Lewisville, TX | 4940 State Highway 121 | 2,300 sq ft | Tenant Finish-Out | ||
| Starbucks | Denton, TX | 4910 Teasley Lane | 1,980 sq ft | Ground-Up | ||
| Curry Up Now | Flower Mound, TX | 2717 Cross Timbers Rd # 400 | 1,879 sq ft | Tenant Finish-Out | ||
| Green Vapor | Little Elm, TX | 2,790 sq ft | Tenant Finish-Out | 2014 |
From the Harrison Construction project records. Sizes are the leased or built area of the space. Contract is the range of the contract value, never the amount; a blank means the office has not added it yet.
How we build it
Why owners choose Harrison for commercial construction in Denton and Lewisville
Restaurants, finish-outs and medical offices, built here
Founded in Fort Worth by Lonnie Harrison, who has more than 25 years in construction. 190 completed projects on record in 8 states, for Firehouse Subs, Sonic, Five Guys, Taco Cabana, Starbucks, El Pollo Loco and 7-Eleven, among 73 brands.
Licensed in Texas and 29 other states
What a landlord, a lender and a franchise brand ask for first, with a ground-up division and a finish-out team under one roof.
Meetings, reports, changes priced first
Regular progress meetings and electronic project reports from the site visit to the punch list. A change is priced and approved before it is built.
Who builds out restaurants in Denton or Lewisville?
Harrison Construction, a Fort Worth commercial general contractor since 2011. Records include Grip Med Grill and Pizza Snob in Denton, Firehouse Subs and Snappy Salads in Lewisville and Luna Grill in Flower Mound.
Which builder should I hire for a new restaurant building in Denton?
One that has built freestanding restaurants from the site work up. Harrison Construction’s records include a ground-up Starbucks in Denton, and the company runs the site work and the building under one contract.
Who does commercial build-outs in Lewisville or Denton?
Harrison Construction does tenant finish-outs and renovations in both cities. Records include First State Bank in Denton, Premier One Auto Care in Lewisville and restaurant finish-outs in both.
Do you build medical offices in Denton County?
Yes. Dental and medical offices are part of our work, and the Lewisville Medical Office Building and the Lewisville Surgery Center are on our client list.
Do you work in Flower Mound, Little Elm and Cross Roads?
Yes. Records include Luna Grill and Curry Up Now in Flower Mound, Green Vapor in Little Elm and Firehouse Subs in Cross Roads.
How do I get a price for a project in Denton County?
Call (817) 988-0242 or use the Discuss your project button. After a site visit and a review of your drawings we prepare a conceptual estimate and a schedule in pre-construction.
Useful before you start

Coffee Shop Build-Out in Fort Worth: What It Takes
A cafe is lighter than a full kitchen, but the bar concentrates water, drains and power in a few feet. What to verify before you sign in Fort Worth, and what a drive-thru adds.
Read
Building a Drive-Thru Restaurant on a Texas Pad Site
A pad site has to work as a whole property, not just fit a building. Here is what to settle before the drawings go out to bid.
Read
Dental Office Build-Out: What to Plan For
A dental office is a building wrapped around its equipment. The plan has to start with the chairs, the utilities that feed them and the people who will coordinate it.
Read
Planning a project in Denton or Lewisville?
Planning a new location, build-out, renovation or commercial development? Tell us about your project and we’ll help identify the next step.
What to send us
The address, the lease or letter of intent, any drawings or the brand’s prototype set, and the date you need to open. Not all of it is needed to start the conversation.
Email office@harrisonconstructionteam.com or call (817) 988-0242.

