Southlake and Grapevine

Commercial contractor in Southlake and Grapevine

Harrison Construction builds out restaurants, retail suites and dental and medical offices in Southlake, Grapevine, Colleyville and Keller from our office in north Fort Worth. Our records there include Luna Grill finish-outs in Southlake and Colleyville, an Oishii renovation in Grapevine, a Luxe Optix retail finish-out in Southlake and a ground-up warehouse in Grapevine. Commercial general contractor since 2011, fully bonded and insured.

  • 5 projects on record
  • 4 brands, 3 cities
  • Fully bonded and insured
A new single-story commercial building with glass storefronts

By Lonnie Harrison, President · November 13, 2026

Who can build out a restaurant in a strip center in Southlake or Grapevine?

A general contractor that has built restaurants inside managed centers before, and that reads the landlord’s work letter as closely as the drawings. In Southlake and Grapevine most restaurant space is in centers with their own rules: approved plans, approved working hours, insurance on file, a storefront and a sign that match the center’s criteria, and a delivery condition that says what the landlord leaves in the suite.

Harrison Construction has done that work here. Our records include a 4,000 sq ft Luna Grill finish-out on East Southlake Boulevard (2015), a 2,900 sq ft Luna Grill finish-out in Colleyville (2015) and a 5,310 sq ft renovation of Oishii in Grapevine. Across our records, 123 of 190 projects are restaurants, most of them finish-outs in Dallas–Fort Worth centers.

Terra restaurant entrance with a pergola patio and planters
A finished restaurant entrance and patio from the Harrison project gallery (Terra Mediterranean). In a Southlake or Grapevine center, the storefront, patio and sign are built to the landlord’s criteria as well as the city code. Photo: Harrison Construction project gallery.

What to check before you sign a restaurant lease in a center

Most of the cost of a strip-center restaurant is decided before construction starts, by the suite you choose and the lease you sign. These are the items we check with you, on site, before the lease is final:

  • Hood and roofwhere the exhaust duct can go up through the roof, whether the landlord allows it, and how the roof is patched and kept under its warranty afterward.
  • Grease interceptorwhether the center has one the suite can connect to or a new one has to be installed outside, and who pays for it.
  • Electrical and gaswhether the service and the gas meter can carry the kitchen, or need an upgrade from the utility.
  • HVACthe age and size of the rooftop units, and whether make-up air for the hood can be added.
  • End cap or inlinean end-cap suite gives more storefront and patio room; an inline suite usually means a longer route for the hood and plumbing.
  • The work letterwhat the landlord builds, what the tenant improvement allowance covers, and what is left for you to pay.

Our guide to finishing out a shell space in a DFW strip center goes through each of these in more depth.

Building in Southlake: codes, contractor registration and permits

Southlake builds to the 2021 International Codes with local amendments adopted by the City Council, in effect since May 1, 2022, and it adopted the 2023 National Electrical Code in November 2023. Plans are submitted, tracked and inspected through the city’s online permitting system.

One Southlake rule surprises owners who bring a contractor from elsewhere: general contractors must register with the city every year, and trade contractors register with their state license. Harrison Construction’s Fort Worth office is a short drive from Southlake, and we work with the city’s Building Inspections division on the permit and the inspections for you.

Screenshot of the City of Southlake Building Inspections page with the General Contractors registration paragraph highlighted
In Southlake, general contractors register with the city every year (highlighted) and trade contractors register with their state license, all through the city’s online permitting system. Screenshot: cityofsouthlake.com, Building Inspections, November 2026.

Building in Grapevine and Colleyville

Grapevine takes development applications and permit fee payments through its OpenGov permitting portal or in person at City Hall, 200 South Main Street. Colleyville runs its own plan review and inspections. The steps are the same in each city; what changes is who reviews the plans and what each landlord requires, so we collect both at the start.

Our Grapevine records include a renovation of Oishii and Huffman Warehouse, an 8,000 sq ft building we built from the ground up. That ground-up work follows the same process we use for a freestanding restaurant or a retail pad: civil drawings, utilities, paving and drainage, the city’s site plan review, then the building. See ground-up construction.

Screenshot of the City of Southlake Building Codes page with the table of adopted 2021 International Codes and ordinance numbers highlighted
Each city adopts its own code editions and local amendments. Southlake lists its adopted 2021 International Codes and the ordinance for each (highlighted); your architect designs to the edition of the city you build in. Screenshot: cityofsouthlake.com, Building Codes, November 2026.

Dental office construction in Keller and Southlake

Keller and Southlake are next to our office in north Fort Worth, and dental and medical offices are part of our work there. A dental office looks simple from the waiting room. Behind it are plumbing to every chair, vacuum and compressed air from a mechanical room, imaging, sterilization and an electrical service that has to carry all of it, set by the equipment the practice chooses.

Brident Dental & Orthodontics and Kool Smiles are on our client list, and a 10,000 sq ft Kool Smiles finish-out is on our project records. Closer to Southlake, our medical records include renovations of the Nick Ritter Medical Office Building in Hurst and of Midcities Wound Care and QT Quik Med in North Richland Hills. Before he founded the company, Lonnie Harrison spent five years in medical construction with a general contractor. See dental and medical office construction and our guide to pediatric dental office build-outs.

Restaurant, dental office or retail suite: what drives the build

Three kinds of tenants account for most build-outs in Southlake and Grapevine centers. The table shows where each one puts its cost and its risk:

What drives a build-out, by type of tenant

ItemRestaurantDental officeRetail suite
PlumbingGrease interceptor, floor drains, sinksSupply and waste to every chair, often trenched in the slabRestroom and a sink
MechanicalHood, exhaust and make-up airVacuum, compressed air, ventilation for treatment roomsHeating and cooling for the sales floor
ElectricalKitchen equipment and walk-inImaging, compressors, sterilizersLighting and display
Second reviewHealth authority plan reviewState rules for x-ray equipmentUsually none beyond the building permit
Landlord approvalsRoof penetrations, grease, patio, signHours of work next to open tenantsStorefront and sign

How to read this table: the further left a column is, the more of the cost sits behind the walls and above the ceiling, and the more it depends on the suite you choose. That is why we review the space before the lease for a restaurant or a dental office, and why two suites of the same size can price very differently.

What a center landlord usually asks of your contractor

A managed center in Southlake or Grapevine protects its other tenants and its building, so the landlord approves your contractor as well as your drawings. Expect the lease or the work letter to ask for most of these before work starts:

  • Insurance certificatesthe contractor’s liability insurance naming the landlord, on file before anyone is on site.
  • Approved plansthe landlord’s sign-off on the drawings, often before the city permit is issued.
  • Working hours and deliverieswhen noisy work, deliveries and dumpsters are allowed, so the neighbors can keep trading.
  • Roof and structurethe landlord’s roofer for penetrations, and approval for anything that touches the structure or the roof warranty.
  • Storefront and signthe center’s criteria for the storefront, the sign, the patio and the colors.
  • Close-out documentsfinal inspections, the certificate of occupancy and the close-out package the landlord needs for its records.

We collect these at the start of pre-construction, so they are in the price and the schedule and not discovered at the first site meeting. Harrison Construction is fully bonded and insured.

Retail and service suites

Our Southlake records include a 1,000 sq ft Luxe Optix retail finish-out on West Southlake Boulevard (2015). A retail suite is the simplest build-out in a center, but the center’s criteria still apply to the storefront, the sign and the working hours, and an existing suite still needs its HVAC, electrical service and restrooms checked against the new layout.

For an operating store or restaurant, we plan the phases with you before pricing and keep the business open where the scope allows. Read more on our retail construction page.

Close to our office

Harrison Construction’s office is at 8553 N. Beach St. in north Fort Worth (76244), between Keller and Alliance, a short drive from Southlake, Grapevine and Colleyville. The same team runs the job: Lonnie Harrison, President; Alex Lioumis, VP of Operations; and Anne Hickey, who coordinates the schedule and the subcontractors. You get regular progress meetings and electronic project reports through close-out.

Call (817) 988-0242 or use the contact page to send the address and what you are planning.

Related: North Fort Worth, Keller and Haslet · Restaurant construction · Dental and medical office construction · General contractor in Fort Worth, TX.

I would be elated to work with Mr Harrison on future projects as I only expect successful and positive outcomes in large part to the direction and effort that Mr. Harrison brings to the project team.
Mike MorganM2 Engineering LLC
On record

5 projects in Southlake, Grapevine and Colleyville

Restaurant, retail and warehouse projects in Southlake, Grapevine and Colleyville from the Harrison Construction project records. Luna Grill (2), Oishii, Huffman Warehouse and Luxe Optix, in Colleyville, Southlake and Grapevine, contracts ranging from under $25,000 to $250,000–$500,000.

All projects on record
ProjectCityAddressSizeWorkCompletedContract
Luna GrillSouthlake, TX1141 E Southlake Blvd #5304,000 sq ftTenant Finish-Out2015$250K–$500K
OishiiGrapevine, TX401 E. State Highway 1145,310 sq ftRenovation$250K–$500K
Luna GrillColleyville, TX5505 Colleyville Blvd #1002,900 sq ftTenant Finish-Out2015$250K–$500K
Huffman WarehouseGrapevine, TX3324 Hall Johnson Rd8,000 sq ftGround-Up$100K–$250K
Luxe OptixSouthlake, TX1959 W Southlake Blvd #1301,000 sq ftTenant Finish-Out2015Under $25K

From the Harrison Construction project records. Sizes are the leased or built area of the space. Contract is the range of the contract value, never the amount; a blank means the office has not added it yet.

Why Harrison

Why owners choose Harrison for a project in Southlake or Grapevine

Since 2011

Restaurants, finish-outs and medical offices, built here

Founded in Fort Worth by Lonnie Harrison, who has more than 25 years in construction. 190 completed projects on record in 8 states, for Firehouse Subs, Sonic, Five Guys, Taco Cabana, Starbucks, El Pollo Loco and 7-Eleven, among 73 brands.

Bonded and insured

Licensed in Texas and 29 other states

What a landlord, a lender and a franchise brand ask for first, with a ground-up division and a finish-out team under one roof.

You always know where it stands

Meetings, reports, changes priced first

Regular progress meetings and electronic project reports from the site visit to the punch list. A change is priced and approved before it is built.

FAQ

Questions about a project in Southlake or Grapevine

All questions and answers

Who can build out a restaurant in a strip center in Southlake or Grapevine?

Harrison Construction, a Fort Worth commercial general contractor since 2011. Our records include Luna Grill finish-outs in Southlake and Colleyville and an Oishii renovation in Grapevine, and we check the suite and the landlord’s work letter with you before the lease is final.

Who does dental office construction in Keller or Southlake?

Harrison Construction builds out and renovates dental and medical offices in Keller, Southlake and Northeast Tarrant County from its north Fort Worth office. Brident Dental & Orthodontics and Kool Smiles are on our client list.

Do contractors have to register with the City of Southlake?

Yes. Southlake requires general contractors to register every year and trade contractors to register with their state license, through the city’s online permitting system.

Do you build new buildings in Grapevine?

Yes. Huffman Warehouse in Grapevine, an 8,000 sq ft building, is one of the ground-up projects on our records.

How much does a restaurant finish-out cost in Southlake?

It depends on the suite, the hood and grease work, the electrical service, the landlord’s work letter and the finishes. We do not quote a figure per square foot without seeing the space; a conceptual estimate in pre-construction gives you a real number.

How far is your office from Southlake and Grapevine?

Our office is at 8553 N. Beach St. in north Fort Worth, between Keller and Alliance, a short drive from Southlake, Grapevine and Colleyville. Call (817) 988-0242.

Restaurant interior with wood screens and daylight
Discuss your project

Planning a project in Southlake, Grapevine or Keller?

Planning a new location, build-out, renovation or commercial development? Tell us about your project and we’ll help identify the next step.

What to send us

The address, the lease or letter of intent, any drawings or the brand’s prototype set, and the date you need to open. Not all of it is needed to start the conversation.

Email office@harrisonconstructionteam.com or call (817) 988-0242.

CallDiscuss your project