- Home
- Industries
- Restaurant Construction
- Franchise Restaurants
Franchise restaurant construction in Dallas–Fort Worth and Texas
Harrison Construction builds franchise and multi-unit restaurant locations: build-outs in shell space, remodels and refreshes of open stores, and freestanding prototypes on pad sites. Lonnie Harrison founded the company in Fort Worth in 2011 after managing restaurant projects for national accounts, and the first project was a Five Guys.
- 103 projects on record
- 15 brands, 53 cities, 4 states
- Fully bonded and insured

Who builds franchise restaurants in Dallas–Fort Worth?
A franchise location is built to someone else’s drawings, on someone else’s schedule, inside a lease with its own rules. The contractor you want is one that has built the same kind of store many times, prices the brand’s prototype without rewriting it, and keeps the franchisee, the franchisor’s construction team and the landlord informed at the same time.
That is the work Harrison Construction was built on. Restaurant brands on our project records include Firehouse Subs, Sonic, Five Guys, El Pollo Loco, Dillas Quesadillas, Snappy Salads, Luna Grill, GAPCo, Starbucks, Taco Cabana and Which Wich. The full list, with city, size and type of work for every location, is in the table below and on our projects page.
What a franchise build-out involves
Every franchise project starts from a prototype: the brand’s drawings, finish schedule, equipment list and signage package. The site adapts it. A strip-center end cap, an inline suite, a second-generation restaurant and a pad site each change the plumbing, the hood and exhaust route, the electrical service and the storefront.
- Site review against the prototypebefore the lease is final: utilities to the suite, grease interceptor, roof access for the hood and rooftop units, demising walls, the landlord’s delivery condition.
- Pricing the brand’s seta conceptual estimate early, then a bid on the permit drawings with the brand’s owner-furnished items and the landlord’s work called out line by line.
- Permits and approvalsthe city building permit, the health authority’s plan review for food service, landlord approval of the plans and the sign permit.
- Constructionone team responsible for the budget, the schedule, the subcontractors, quality and safety, with regular progress meetings and electronic reports to the franchisee and, when asked, the brand.
- Close-outfinal inspections, the certificate of occupancy, the punch list and the close-out documents the brand and the landlord ask for.
Franchise remodels and image updates
Brands refresh their stores on a cycle, and a remodel of an open restaurant is a different job from a new build-out. The store keeps selling, so the work is phased, after-hours work is planned, and the kitchen stays usable for as long as possible.
Many of our restaurant records are remodels and renovations of operating locations, including Sonic drive-ins, Taco Cabana and GAPCo stores. We plan the phases with the operator before pricing, so the cost of working around the business is in the bid, not a surprise later.
Rollouts: several locations, one contractor
A franchisee or area developer opening several stores needs the same standard at every one, and lessons from the first store applied to the second. Harrison Construction is licensed in Texas and other states for exactly this, and our records include restaurant locations outside Texas in Louisiana, Oklahoma and Missouri.
For a rollout we keep one point of contact, reuse what worked on the brand’s earlier stores, and report each location separately so the developer sees every store’s budget and schedule.
How to choose a franchise restaurant contractor
Ask every contractor you interview the same questions, and compare the answers, not only the totals.
- Which locations of this brand, or of brands like it, have you built?Ask for the list with cities. Ours is published.
- Who prices the job, and who runs it day to day?At Harrison: Lonnie Harrison, President, and Alex Lioumis, VP of Operations, who oversees project execution, field personnel and subcontractors.
- What is excluded?Owner-furnished equipment, low-voltage, signage and landlord work are the usual gaps between two bids.
- How will I know where the job stands?We hold regular progress meetings and send electronic project reports.
- Are you bonded and insured?Harrison Construction is fully bonded and insured.
Related: Multi-state rollouts · Restaurant construction · Freestanding restaurants.
I would be elated to work with Mr Harrison on future projects as I only expect successful and positive outcomes in large part to the direction and effort that Mr. Harrison brings to the project team.
103 locations for 15 restaurant brands
Restaurant brands with more than one location in the Harrison Construction project records. Firehouse Subs (29), Sonic (15), Five Guys (11), Dillas Quesadillas (8), El Pollo Loco (8), Snappy Salads (6) and 9 more, in 53 cities across 4 states, contracts ranging from under $25,000 to $1 million–$2 million.
| Project | City | Address | Size | Work | Completed | Contract |
|---|---|---|---|---|---|---|
| Terra Mediterranean | Plano, TX | 2401 Dallas Parkway, Suite RS-1 | 7,413 sq ft | Tenant Finish-Out | 2018 | $1M–$2M |
| Dillas Quesadillas | Frisco, TX | 2055 University Dr | 3,000 sq ft | Ground-Up | $1M–$2M | |
| El Pollo Loco | Grand Prairie, TX | 2660 S HWY 161 | 3,150 sq ft | Ground-Up | 2018 | $1M–$2M |
| Dillas Quesadillas | Ruston, LA | 1003 Cooktown Rd | 1,400 sq ft | Ground-Up | 2024 | $500K–$1M |
| GAPCo | Richardson, TX | 520 Lockwood Dr. Suite #200 | 4,800 sq ft | Tenant Finish-Out · Ovens | $500K–$1M | |
| Dillas Quesadillas | Frisco, TX | 3930 Preston Rd. #140 | 2,800 sq ft | Tenant Finish-Out · Drive-thru expansion | 2017 | $500K–$1M |
| Starbucks | Irving, TX | 4080 W. Airport Freeway | 931 sq ft | Ground-Up | $500K–$1M | |
| Dillas Quesadillas | Forney, TX | 303 Marketplace Blvd | 2,950 sq ft | Tenant Finish-Out | $250K–$500K | |
| Luna Grill | Southlake, TX | 1141 E Southlake Blvd #530 | 4,000 sq ft | Tenant Finish-Out | 2015 | $250K–$500K |
| Dillas Quesadillas | Plano, TX | 2008 Midway Rd | 3,200 sq ft | Tenant Finish-Out | $250K–$500K | |
| Oishii | Grapevine, TX | 401 E. State Highway 114 | 5,310 sq ft | Renovation | $250K–$500K | |
| Fat Straws | Arlington, TX | 4001 W. Matlock Rd | 1,900 sq ft | Tenant Finish-Out | $250K–$500K | |
| Luna Grill | Colleyville, TX | 5505 Colleyville Blvd #100 | 2,900 sq ft | Tenant Finish-Out | 2015 | $250K–$500K |
| Firehouse Subs | Stephenville, TX | 2675 W. Washington #200 | 1,900 sq ft | Tenant Finish-Out | $250K–$500K | |
| Firehouse Subs | Cleburne, TX | 1663 W. Henderson St | 1,900 sq ft | Tenant Finish-Out | 2023 | $250K–$500K |
| Dillas Quesadillas | McKinney, TX | 3510 W University, Suite 102 | 2,200 sq ft | Tenant Finish-Out | 2018 | $250K–$500K |
| Taco Cabana | Houston, TX | 6522 Westheimer Rd | 4,015 sq ft | Renovation | $250K–$500K | |
| Firehouse Subs | Coppell, TX | 150 S Denton Tap Rd | 1,900 sq ft | Tenant Finish-Out | 2023 | $250K–$500K |
| Grip Med Grill | Arlington, TX | 115 West 2nd St. | 3,000 sq ft | Tenant Finish-Out | 2013 | $250K–$500K |
| Dillas Quesadillas | Nacogdoches, TX | 2829 N. Street | 2,650 sq ft | Renovation | 2025 | $250K–$500K |
| Taco Cabana | Hurst, TX | 1495 Precinct Line Rd | 4,034 sq ft | Renovation | 2018 | $250K–$500K |
| Luna Grill | Flower Mound, TX | 2500 Cross Timbers Rd | 3,400 sq ft | Tenant Finish-Out | 2014 | $250K–$500K |
| Grip Med Grill | Denton, TX | 1200 West Hickory Street | 3,000 sq ft | Tenant Finish-Out | 2012 | $250K–$500K |
| Firehouse Subs | Plano, TX | 901 Central Expressway Suite #300 | 1,900 sq ft | Tenant Finish-Out | 2022 | $250K–$500K |
| Firehouse Subs | Cross Roads, TX | 11750 US 380 #210 | 1,900 sq ft | Tenant Finish-Out | $250K–$500K | |
| Grip Med Grill | Dallas, TX | 6030 Luther Lane, Suite 140 | 3,000 sq ft | Tenant Finish-Out | 2012 | $250K–$500K |
| El Pollo Loco | Watauga, TX | 7900 Denton Hwy | 3,150 sq ft | Renovation | $250K–$500K | |
| Firehouse Subs | Red Oak, TX | 106 E. Ovilla Rd #3 | 1,900 sq ft | Tenant Finish-Out | $100K–$250K | |
| Firehouse Subs | Waxahachie, TX | 1400 North Hwy 77 # 400 | 1,900 sq ft | Tenant Finish-Out | $100K–$250K | |
| El Pollo Loco | Dallas, TX | 9455 Forest Lane | 3,150 sq ft | Renovation | $100K–$250K | |
| Dillas Quesadillas | Denton, TX | 1715 S Loop 288 Suite 100 | 2,800 sq ft | Renovation | $100K–$250K | |
| Firehouse Subs | Keller, TX | 1411 Keller Pkwy | 1,900 sq ft | Tenant Finish-Out | 2018 | $100K–$250K |
| GAPCo | Dallas, TX | 1923 Greenville Ave | 1,400 sq ft | Renovation · Exhaust hood | $100K–$250K | |
| Terra Mediterranean | Fort Worth, TX | 2973 Crockett St | 5,800 sq ft | Tenant Finish-Out | 2014 | $50K–$100K |
| Sonic | Arlington, TX | 4111 S. Bowden Rd | 900 sq ft | Renovation | $50K–$100K | |
| Sonic | Keller, TX | 8661 N Beach St | 900 sq ft | Renovation | $25K–$50K | |
| Sonic | Fort Worth, TX | 3078 Basswood Blvd | 900 sq ft | Renovation | $25K–$50K | |
| GAPCo | Dallas, TX | 1910 Summit Ave | 1,500 sq ft | Renovation · Office | $25K–$50K | |
| Sonic | Allen, TX | McDermott | 900 sq ft | Renovation | Under $25K | |
| GAPCo | Dallas, TX | 1145 Peavy Road | 689 sq ft | Renovation | Under $25K | |
| Sonic | Rowlett, TX | 6601 Dalrock | 900 sq ft | Renovation | Under $25K | |
| Sonic | Hurst, TX | 1308 Precinct Line | 900 sq ft | Renovation · Wall repair | Under $25K | |
| Sonic | Fort Worth, TX | Tehama Ridge Parkway | 900 sq ft | Renovation | Under $25K | |
| Firehouse Subs | Cedar Hill, TX | 352 N Hwy 67 | 1,900 sq ft | Tenant Finish-Out, Renovation · Remodel | 2015 | Under $25K |
| Sonic | Garland, TX | 245 Cedar Sage Dr | 900 sq ft | Renovation | Under $25K | |
| Sonic | Fort Worth, TX | 9560 Clifford St. | 900 sq ft | Renovation | Under $25K | |
| Sonic | Allen, TX | 1536 E Stacy Road | 900 sq ft | Renovation | Under $25K | |
| Sonic | Dallas, TX | 3650 Frankford Road | 900 sq ft | Renovation | Under $25K | |
| Sonic | Dallas, TX | 12130 Inwood | 900 sq ft | Renovation | Under $25K | |
| Sonic | Fort Worth, TX | 1700 Western Center Blvd | 900 sq ft | Renovation | Under $25K | |
| Sonic | Princeton, TX | 401 E Princeton Dr | 900 sq ft | Renovation | Under $25K | |
| Sonic | McKinney, TX | 420 N. Custer Road | 900 sq ft | Renovation | Under $25K | |
| Firehouse Subs | Addison, TX | 4135 Belt Line Rd. Suite 120 | 1,900 sq ft | Tenant Finish-Out | 2026 | |
| Firehouse Subs | Arlington, TX | 1805 N Collins St | 1,900 sq ft | Tenant Finish-Out | 2017 | |
| Firehouse Subs | Athens, TX | 1010 East Tyler St. # 100 | 1,900 sq ft | Tenant Finish-Out | 2023 | |
| Firehouse Subs | Cypress, TX | 9430 Fry Rd, Suite 100 | 1,900 sq ft | Tenant Finish-Out | 2025 | |
| Firehouse Subs | Dallas, TX | 18208 Preston Rd | 1,900 sq ft | Tenant Finish-Out | 2016 | |
| Firehouse Subs | Dallas, TX | 5549 LBJ Fwy # 150 | 1,900 sq ft | Tenant Finish-Out | 2023 | |
| Firehouse Subs | Forney, TX | 514 W. US Hwy 80 | 1,900 sq ft | Tenant Finish-Out | 2023 | |
| Firehouse Subs | Fort Worth, TX | 4845 Bryant Irvin Rd | 1,900 sq ft | Tenant Finish-Out | 2015 | |
| Firehouse Subs | Fort Worth, TX | 501 Alta Mere Dr | 1,900 sq ft | Tenant Finish-Out | 2015 | |
| Firehouse Subs | Granbury, TX | 325 E Hwy 377 | 1,900 sq ft | Tenant Finish-Out | 2016 | |
| Firehouse Subs | Humble, TX | 7036 FM 1960 E. Unit A-2 | 1,900 sq ft | Tenant Finish-Out | 2025 | |
| Firehouse Subs | Katy, TX | 29615 Jordan Ranch Crossing # 210 | 1,900 sq ft | Tenant Finish-Out | 2026 | |
| Firehouse Subs | Lewisville, TX | 2325 S. Stemmons Fwy #308 | 1,900 sq ft | Tenant Finish-Out | 2015 | |
| Firehouse Subs | McKinney, TX | 2890 Craig Dr | 1,900 sq ft | Tenant Finish-Out | 2015 | |
| Firehouse Subs | Owasso, OK | 9538 N Garnett Rd | 1,900 sq ft | Tenant Finish-Out | 2015 | |
| Firehouse Subs | Richardson, TX | 1390 E Belt Line Rd | 1,900 sq ft | Tenant Finish-Out | 2016 | |
| Firehouse Subs | Saginaw, TX | 1005 N. Saginaw Blvd, Suite 102 | 1,900 sq ft | Tenant Finish-Out | 2025 | |
| Firehouse Subs | Temple, TX | 145 Westfield Blvd Suite 120 | 1,900 sq ft | Tenant Finish-Out | 2023 | |
| Firehouse Subs | Waco, TX | 4215 Franklin Ave | 1,900 sq ft | Tenant Finish-Out | 2025 | |
| Firehouse Subs | Wichita Falls, TX | 3201 Lawrence Rd | 1,900 sq ft | Tenant Finish-Out | 2017 | |
| Five Guys | Amarillo, TX | 2313 S Georgia St | 2,400 sq ft | Tenant Finish-Out | 2015 | |
| Five Guys | Arlington, TX | 4245 S Cooper St | 2,400 sq ft | Tenant Finish-Out | 2015 | |
| Five Guys | Dallas, TX | 13350 Dallas Pkwy | 2,400 sq ft | Tenant Finish-Out | 2015 | |
| Five Guys | Fort Worth, TX | 313 Houston St | 2,400 sq ft | Tenant Finish-Out | 2013 | |
| Five Guys | Irving, TX | 6440 N MacArthur Blvd | 2,400 sq ft | Tenant Finish-Out | 2015 | |
| Five Guys | Lubbock, TX | 6076 Marsha Sharp Fwy | 2,400 sq ft | Tenant Finish-Out | 2014 | |
| Five Guys | Mesquite, TX | 1725 N Town E Blvd | 2,400 sq ft | Tenant Finish-Out | 2015 | |
| Five Guys | Midland, TX | 2816 Loop 250 Frontage Rd #300 | 2,400 sq ft | Tenant Finish-Out | 2015 | |
| Five Guys | Plano, TX | 1201 E Spring Creek Pkwy | 2,400 sq ft | Tenant Finish-Out | 2015 | |
| Five Guys | Rockwall, TX | 1035 I-30 | 2,400 sq ft | Tenant Finish-Out | 2015 | |
| Five Guys | Wichita Falls, TX | 3100 Midwestern Pkwy | 2,400 sq ft | Tenant Finish-Out | 2013 | |
| El Pollo Loco | Arlington, TX | 4911 S Cooper St | 3,150 sq ft | Ground-Up | ||
| El Pollo Loco | Bedford, TX | 1900 Central Rd | 3,150 sq ft | Ground-Up | ||
| El Pollo Loco | Grand Prairie, TX | 2125 N State Hwy 360 | 3,150 sq ft | Ground-Up | ||
| El Pollo Loco | Hurst, TX | 1245 W Pipeline Rd | 3,150 sq ft | Ground-Up | ||
| El Pollo Loco | Irving, TX | 2137 Estrada Pkwy | 3,150 sq ft | Ground-Up | ||
| Snappy Salads | Dallas, TX | 717 N. Harwood | 1,911 sq ft | Tenant Finish-Out | 2017 | |
| Snappy Salads | Fort Worth, TX | 1664 S. University Dr., Suites D & E | 2,893 sq ft | Tenant Finish-Out | 2017 | |
| Snappy Salads | Frisco, TX | 5252 West Main St. Suite 100 | 2,501 sq ft | Tenant Finish-Out | ||
| Snappy Salads | Lewisville, TX | 4940 State Highway 121 | 2,300 sq ft | Tenant Finish-Out | ||
| Snappy Salads | Plano, TX | 5588 TX 121 | 2,200 sq ft | Tenant Finish-Out | 2016 | |
| Snappy Salads | Plano, TX | 5930 W Park Blvd | 1,987 sq ft | Tenant Finish-Out | 2016 | |
| Luna Grill | Dallas, TX | 3921 Gaston Ave. Suite A | 2,700 sq ft | Tenant Finish-Out | ||
| Luna Grill | Plano, TX | 2444 Preston Rd | 2,699 sq ft | Tenant Finish-Out | ||
| Oishii | Dallas, TX | 5627 SMU Boulevard | 1,700 sq ft | Tenant Finish-Out | ||
| Oishii | Plano, TX | 8448 Parkwood Blvd # 700 | 1,400 sq ft | Tenant Finish-Out | ||
| Starbucks | Denton, TX | 4910 Teasley Lane | 1,980 sq ft | Ground-Up | ||
| Starbucks | Early, TX | 117 Early Blvd | 2,200 sq ft | Ground-Up | ||
| Fat Straws | Richardson, TX | 1,900 sq ft | Tenant Finish-Out | |||
| Which Wich | Kansas City, MO | 554 Westport Rd #100 | 1,656 sq ft | Tenant Finish-Out | ||
| Which Wich | San Antonio, TX | 2026 Babcock Rd | 1,390 sq ft | Tenant Finish-Out |
From the Harrison Construction project records. Sizes are the leased or built area of the space. Contract is the range of the contract value, never the amount; a blank means the office has not added it yet.
How we build it
Why owners choose Harrison for franchise restaurant construction
Restaurants, finish-outs and medical offices, built here
Founded in Fort Worth by Lonnie Harrison, who has more than 25 years in construction. 190 completed projects on record in 8 states, for Firehouse Subs, Sonic, Five Guys, Taco Cabana, Starbucks, El Pollo Loco and 7-Eleven, among 73 brands.
Licensed in Texas and 29 other states
What a landlord, a lender and a franchise brand ask for first, with a ground-up division and a finish-out team under one roof.
Meetings, reports, changes priced first
Regular progress meetings and electronic project reports from the site visit to the punch list. A change is priced and approved before it is built.
Who builds out franchise restaurants in DFW?
Harrison Construction, a Fort Worth commercial general contractor since 2011, builds franchise restaurant build-outs, remodels and freestanding locations across Dallas–Fort Worth. Brands on our project records include Firehouse Subs, Sonic, Five Guys, El Pollo Loco, Snappy Salads, Starbucks and Taco Cabana.
Do you build quick-service restaurants in Texas?
Yes. Quick-service and fast-casual restaurants are the largest part of our records, in Dallas–Fort Worth and across Texas, plus locations in Louisiana, Oklahoma and Missouri.
Do you build burger franchise locations?
Yes. Five Guys and Mooyah are on our project records, and Five Guys was the company’s first project in 2011.
Can you build a brand’s prototype as drawn?
Yes. We price the brand’s prototype set as drawn, adapt it to the site with the brand’s architect, and call out any change the site forces before the bid is final.
Do you work for franchise developers with several stores?
Yes. Multi-unit and multi-state rollouts are part of our work, with one point of contact and separate reporting for each location.
Are you licensed outside Texas?
Yes. Harrison Construction is licensed in Texas and other states for brands that roll out several locations. See the multi-state rollouts page for the list.
Can you remodel a franchise restaurant while it stays open?
Often, with phasing and after-hours work; it depends on the scope. We plan the phases with you before pricing.
Useful before you start

Building a Drive-Thru Restaurant on a Texas Pad Site
A pad site has to work as a whole property, not just fit a building. Here is what to settle before the drawings go out to bid.
Read
Remodeling a Restaurant While It Stays Open
Many restaurant remodels can be built around service. It starts with deciding what must stay open, then building every phase around a usable restaurant.
Read
Taking Over a Second-Generation Restaurant Space in DFW
A kitchen someone left behind can save work or hide it. What to test, what to ask the landlord and how the remodel gets scoped before you sign.
Read
Planning a franchise restaurant project?
Planning a new location, build-out, renovation or commercial development? Tell us about your project and we’ll help identify the next step.
What to send us
The address, the lease or letter of intent, any drawings or the brand’s prototype set, and the date you need to open. Not all of it is needed to start the conversation.
Email office@harrisonconstructionteam.com or call (817) 988-0242.

