Salon Suite and Day Spa Build-Outs in Dallas-Fort Worth: What the Space Needs and Who Builds It

By Lonnie Harrison, PresidentNovember 23, 202612 min read
A hair salon styling floor with brown leather salon chairs on hydraulic bases, mirrors and shelving along both walls and a wood floor
A styling floor puts a chair, a mirror, outlets and storage at every station, and the floor has to take rolling chairs and daily cleaning. Photo: Daderot, CC0, via Wikimedia Commons (a salon in Arlington, Massachusetts). Not a Harrison project.

Salon suites and day spas in Dallas-Fort Worth are built by commercial general contractors with salon and spa finish-outs on their records, working with the owner’s architect and the brand’s standards. Most go into a retail or office suite in a shopping center, so the work is decided by what that suite can carry: water and drains for every shampoo bowl, power for every station, air for many small rooms and walls that keep sound in. At Harrison Construction, salon suites and spas are part of our specialty commercial construction work: five Phenix Salon Suites finish-outs and Riviera Spa in Dallas are on our records.

In short
  • A salon suite building is many small salons under one roof, so plumbing, power and air are repeated in every suite.
  • In Texas, the license model shapes the plan: TDLR calls an establishment that rents space to licensed mini-establishments a gallery establishment.
  • Shampoo bowls decide the plumbing, and the plumbing decides how much slab gets cut.
  • A day spa is built around quiet: sound separation, soft light and air that does not carry noise from room to room.
  • Ask any contractor for the salon and spa finish-outs on its records, with the city and the size of each one.

Who builds salon suites and day spas in Dallas-Fort Worth?

A salon suite or day spa is a commercial tenant finish-out. It needs drawings from an architect, a building permit from the city, an accessibility review on larger projects and a general contractor who coordinates the plumbing, electrical and mechanical trades inside a space that was usually built for something else.

The contractor you want has finished out salons or spas before, walks the space before you sign the lease, and prices it from your suite count and your plan, not from a number per square foot. Ask for the list: which salon or spa projects, in which cities, at what size. A contractor who cannot name them is learning on your job.

Harrison Construction’s records include five Phenix Salon Suites finish-outs: two in Arlington, of 10,256 and 9,551 sq ft; one in Prosper, of 7,350 sq ft, completed in 2023; one in League City, of 6,100 sq ft; and one in Tulsa, Oklahoma, of 5,975 sq ft. In Dallas we finished out Riviera Spa on Arapaho Road, a 7,449 sq ft day spa. These sit alongside more than a decade of tenant finish-outs for restaurants, medical offices and retail across Dallas-Fort Worth.

Salon suites, a full salon or a day spa: settle the model first

Three kinds of beauty business are often discussed as one. For the build they are different projects.

  • Salon suites. One operator leases a large space and divides it into small, lockable suites, each rented to an independent stylist, barber, esthetician or nail technician. The building is mostly a corridor, a lobby and many identical small rooms.
  • A full-service salon. One business with an open styling floor, a shampoo area, a color bar and a reception desk. Fewer walls, more open plumbing and a front of house that sells.
  • A day spa. Private treatment rooms for massage, facials and body treatments, often with changing rooms, showers, a relaxation lounge and laundry. The plan is built around quiet and privacy.

In Texas the license model matters as much as the floor plan. The Texas Department of Licensing and Regulation (TDLR) licenses barbering and cosmetology establishments. Its establishment license page describes the salon suite model directly: an establishment that rents space to mini-establishments is called a gallery establishment, and a mini-establishment must be inside a licensed full-service or specialty establishment. The same page says that establishments that lease space are responsible for maintaining all common areas.

Screenshot of the TDLR Apply for a New Establishment License page, with the Leasing Space, Gallery Establishment Owners and Mini-Establishment License Holders headings highlighted
TDLR’s establishment license page, Leasing Space section (highlighted): a building that rents suites to licensed mini-establishments is a gallery establishment, and it maintains the common areas. Source: tdlr.texas.gov, Barbering and Cosmetology, read November 2026.

For the build, that means the operator and the architect should settle which areas are common and which belong to each suite before the plan is drawn. Corridors, the lobby, restrooms, the laundry and the break room are the operator’s to keep up, so they get the most durable finishes. Licensing itself is the operator’s job. We build to the drawings, and we ask for the operator’s list of what each suite must contain so it is in the price from the start. TDLR also publishes a required equipment page and an inspections guide for establishments, and both are worth reading before the room list is final.

What a salon suite building needs from the space

A typical salon suite building has a lobby with a seating area and a directory, a corridor or two, the suites themselves and a back-of-house core. The brand’s prototype, if there is one, sets the details. The list below is the usual starting point.

  • Lobby and corridor. A front door clients can find, seating, a directory of the suites, and a corridor wide enough for a client in a wheelchair and a cart at the same time.
  • Styling suites. A lockable door, a styling station with a mirror, outlets at the station, a shampoo bowl in most suites, storage and good light at the chair.
  • Specialty suites. Esthetics, lash, nail or barber suites, each with its own power, light and sink needs. A nail suite also needs a plan for fumes.
  • Restrooms. Accessible restrooms for clients and tenants, usually off the corridor.
  • Laundry. Washers and dryers for towels, with water, drains, dryer venting and the electrical or gas service they need.
  • Break room and storage. A sink, a refrigerator space and shelving for the tenants, out of the client path.

A salon suite building repeats one small room many times. That is good news for the budget, because a decision made once is copied into every suite. It also means a mistake is copied, so the first suite on the drawings deserves the most attention.

Suite by suite: what the build has to provide

The table lists the main spaces of a salon suite building or day spa, what each one asks of the construction and the point in the build after which a change gets expensive.

What each space in a salon suite building or day spa asks of the build

SpaceWhat happens thereWhat the build has to provideSettle before
Styling suiteCuts, color, stylingShampoo bowl with hot and cold water and a drain, outlets at the station, task lighting, a lockable door, durable flooringPlumbing rough-in
Esthetics or lash suiteFacials, lashes, browsA sink, outlets at the bed and the equipment, adjustable lighting, privacyElectrical rough-in
Nail suiteManicures and pedicuresSinks or pedicure plumbing where used, ventilation for fumes, outlets at each tableMechanical design
Treatment room (spa)Massage, body treatmentsSound separation in walls and ceiling, dimmable light, quiet air supply, a sink where the plan calls for oneFraming and insulation
Wet room or shower (spa)Body treatments, changingFloor drains, waterproofing, slip-resistant floors, exhaustPlumbing rough-in and waterproofing
Lobby and corridorArrival, waiting, wayfindingAccessible route, durable finishes, the directory and the brand’s lookFinish schedule
LaundryTowels and linensWater and drains, dryer venting to the outside, power or gas for the machinesMechanical and plumbing design
Restrooms and break roomClients and tenantsAccessible fixtures, a break room sink, storagePlumbing rough-in

How to read this table: the last column is the stage after which moving or adding that item means opening finished work. Most of the expensive items are under the floor or above the ceiling, which is why the plan should be settled before the plumbing goes in.

Water and drains: shampoo bowls decide the plumbing

A retail suite usually has one or two restrooms at the back. A salon suite building may need a shampoo bowl in most of its suites, plus sinks in the esthetics rooms, the laundry and the break room. Every one of those needs a drain that slopes to the sewer line.

In most Dallas-Fort Worth shopping centers that means cutting and trenching the slab to run new drain lines, then patching it. The farther a suite is from the building’s sewer line, the longer the trench. If the slab is post-tensioned, the cables in it have to be located before anyone cuts. This is why two spaces of the same size can price very differently, and why we look at where the sewer runs before you sign.

Two black salon shampoo bowls with hand sprayers set into a wood-paneled cabinet in an unfinished room
Every shampoo bowl needs hot and cold water and a drain that reaches the sewer line, so the number and position of the bowls decide how much slab gets cut. Photo: johnrosman, CC BY 2.0, via Wikimedia Commons. Not a Harrison project.

Hot water is the second question. Many stylists washing hair at the same time use a lot of it. The water heater, or several of them, is sized by the plumbing engineer from the fixture count, and it needs a place in the plan with access for service. Hair also collects in drains. Fixtures and drain lines that can be reached and cleaned save the operator calls later.

Plumbing is also where estimates from different contractors drift apart, often because one included the trenching and one assumed it away. Our guide to common budget surprises in commercial construction covers how to compare bids line by line.

Power, light and air in a building of small rooms

Power

Blow dryers, flat irons, color processors, hot towel cabinets, facial steamers and pedicure chairs all draw power, and in a salon suite building they run in many suites at once. The electrical engineer sizes the circuits for each suite and the service for the building. An older retail suite may have a service that was right for a clothing store and too small for a salon. We check the panel and the service on the site visit, because an upgrade from the utility company takes coordination and should be known before the lease is final.

Light

Stylists judge color under the light at the chair, so lighting at each station matters more than in most retail. Treatment rooms in a spa need the opposite: soft, dimmable light. Both are decided on the drawings, with the fixtures chosen before the electrical rough-in.

Air

A retail suite was cooled as one open room. A salon suite building is many small rooms with closed doors, plus dryers and hot tools adding heat. The ductwork is reworked so each suite gets supply air and a return path, and the rooftop units are checked for size and age. Color, chemical services and nail work add odors and fumes, so exhaust and fresh air are part of the mechanical design, not an afterthought.

A long salon styling floor with leather salon chairs, mirrors with lights above them and shelving with plants and products
Each styling station needs outlets, light at the mirror and air that reaches it. In a salon suite building the same station is repeated behind every suite door. Photo: Daderot, CC0, via Wikimedia Commons. Not a Harrison project.

Day spas: building for quiet

A day spa sells calm, and the building has to deliver it. Most of the cost difference between an office finish-out and a spa finish-out is in things clients never see: insulation in the walls, walls taken up to the deck above instead of stopping at the ceiling, solid doors with seals, and ductwork laid out so it does not carry sound from one room to the next.

Wet areas add plumbing and waterproofing: showers, body treatment rooms, pedicure areas and sometimes a steam room. Floors there need drains and a slip-resistant finish. A spa also runs a lot of laundry, so the laundry room is planned early, with venting and enough power or gas for commercial machines.

Licensing is wider than for a salon. TDLR also regulates massage therapy, and it publishes guidance for medical spas. If the spa will offer massage or any medical treatment, the operator should confirm with the regulators which licenses and rooms are required before the design starts, so the plan does not have to change after the permit.

Riviera Spa in Dallas, a 7,449 sq ft finish-out on Arapaho Road, is the day spa on our records. If you are planning a spa in North Dallas, our tenant finish-outs in Dallas page covers how we work there.

What to check before you sign the lease

Salon suite operators look for visible end caps and suites in busy centers with parking. Those are good sites. Each one still needs an hour of checking with a contractor before the lease is signed.

  1. The sewer line. Where it runs, and how far the farthest shampoo bowl will be from it.
  2. The slab. Whether it can be trenched, and whether it is post-tensioned.
  3. Water heating. Where the water heaters will go and how the gas or electrical service will feed them.
  4. Electrical service. Size of the service and room in the panel for every suite, the laundry and the HVAC.
  5. HVAC. Age and size of the rooftop units, and who pays to replace them under the lease.
  6. Use. Whether the center’s zoning and the landlord’s rules allow the use, and whether the city treats the conversion as a change of use.
  7. Accessibility. Accessible parking, the route to the door, the corridor and the restrooms.
  8. The work letter. What the landlord delivers, what the tenant improvement allowance covers and when rent starts.
A practical stepBring your suite count and a rough plan to the site visit. Standing in the space with it, a contractor can tell you quickly where the sewer line limits the layout and which suites will be the expensive ones.

If the space is a bare shell, our guide to finishing out a shell space in a DFW strip center explains the landlord’s work letter and what a shell usually leaves for the tenant to build. We do this review as part of pre-construction, before the drawings are final.

Permits, inspections and the TDLR side

A salon suite building or day spa needs a commercial building permit from the city where it opens: Dallas, Fort Worth, Arlington, Plano, Prosper or any other. Your architect prepares the drawings. We take them through plan review with the architect, schedule the inspections and see the job through to the certificate of occupancy.

Accessibility is reviewed separately. Texas requires an accessibility review by a registered accessibility specialist for larger commercial projects, through TDLR’s architectural barriers program, and a salon suite building with a long corridor and many doors has a lot for that review to look at.

The establishment license is a third track, run by the operator with TDLR. The build has to be finished before the space can be used, so we plan the final inspections and the certificate of occupancy with the operator’s opening date in mind. How long each step takes depends on the city’s review load and how complete the drawings are, and we do not guess it. Our guide to how long a commercial tenant finish-out takes explains what moves the schedule.

Building several locations for one salon suite brand

Salon suite brands grow by opening location after location, often through franchisees. Our five Phenix Salon Suites finish-outs are an example: Arlington twice, Prosper, League City near Houston and Tulsa, Oklahoma, from 5,975 to 10,256 sq ft. Each space was different. The brand’s standards were the same.

On a second or third location, what worked in the first one, from the suite size to the shampoo bowl position and the finishes, is repeated and priced early. What changes is the space: where the sewer runs, what the landlord delivers and which city reviews the plans. Our Arlington and Plano, Frisco and McKinney pages show how those cities fit our work, and our multi-state rollouts page explains how we build for a brand outside Texas.

Remodels are part of the life of a salon suite building too. When tenants change, suites are refreshed or combined while the rest of the building stays open. That is commercial renovation work, phased so the open suites keep working.

How Harrison Construction builds a salon suite or spa

Every project starts with pre-construction: due diligence on the space, a conceptual estimate, value engineering, a constructability review, a development schedule, bidding, subcontractor qualification and permitting. During construction you get regular progress meetings and electronic project reports, and one team is responsible for the budget, the schedule, the subcontractors, quality and safety through close-out.

We are fully bonded and insured and licensed in Texas and 29 other states. Our office is in north Fort Worth, and we build across Dallas-Fort Worth, from Arlington and Fort Worth to Dallas, Plano and Prosper. Lonnie Harrison, who has more than 25 years in construction, founded the company in 2011.

If you are planning salon suites or a day spa, send the address, the lease status and your suite count through our contact page, or call (817) 988-0242. We will walk the space with you and tell you what it will take.

Questions owners ask

Who builds salon suites in Dallas-Fort Worth?

Commercial general contractors with salon finish-outs on their records, working with the operator’s architect and the brand’s standards. Harrison Construction has five Phenix Salon Suites finish-outs on record, two of them in Arlington and one in Prosper, and Riviera Spa in Dallas.

How much does a salon suite build-out cost?

It depends on the space more than the size: how far the shampoo bowls are from the sewer line, whether the slab can be trenched, the electrical service, the HVAC and what the landlord delivers. A per-square-foot figure hides all of that. A site visit and a conceptual estimate from your suite count give you a real number.

Can a retail space become a salon suite building?

Often, yes, and most are built that way. Check the sewer line, the slab, the electrical service, the HVAC, the parking and whether the center allows the use before you sign the lease.

What is a gallery establishment in Texas?

TDLR uses the term for an establishment that rents space to mini-establishments, which is the salon suite model. TDLR’s establishment license page says a mini-establishment must be inside a licensed full-service or specialty establishment, and that establishments that lease space maintain the common areas. The operator handles the licensing with TDLR.

What makes a day spa build-out different from an office finish-out?

Sound, water and light. Treatment rooms need walls and ceilings that keep sound in, wet areas need drains and waterproofing, and the lighting is soft and dimmable. A spa also runs a lot of laundry, so the laundry room is planned early.

Do you build salon suites outside Dallas-Fort Worth?

Yes. Our Phenix Salon Suites records include League City near Houston and Tulsa, Oklahoma, and Harrison Construction is licensed in Texas and 29 other states for brands that open several locations.

When should I call a contractor?

Before you sign the lease if you can. A site visit and a pre-construction review show where the plumbing will run, what the electrical service can carry and what the landlord leaves for you to build, while you can still negotiate.

Lonnie Harrison, President of Harrison Construction
Lonnie Harrison, PresidentFounded Harrison Construction in Fort Worth in 2011. About Lonnie · (817) 988-0242
Restaurant interior with wood screens and daylight
Discuss your project

Let’s build what’s next.

Planning a new location, build-out, renovation or commercial development? Tell us about your project and we’ll help identify the next step.

What to send us

The address, the lease or letter of intent, any drawings or the brand’s prototype set, and the date you need to open. Not all of it is needed to start the conversation.

Email office@harrisonconstructionteam.com or call (817) 988-0242.

CallDiscuss your project