Harrison ConstructionFort Worth, Texas
  1. Home
  2. Service areas
  3. Arlington
Arlington, TX

Restaurant and commercial build-out contractor in Arlington, TX

Harrison Construction is a Fort Worth commercial general contractor that builds restaurants and commercial interiors in Arlington, TX. Our Arlington records include a ground-up El Pollo Loco, finish-outs for Five Guys, Firehouse Subs, Grip Med Grill and Fat Straws, a Sonic renovation and two Phenix Salon Suites finish-outs. We have built across Dallas–Fort Worth since 2011, and we are fully bonded and insured.

  • 9 projects on record
  • 8 brands, 1 city
  • Fully bonded and insured
A restaurant dining room seen through a large storefront window

By Lonnie Harrison, President · November 13, 2026

Who is a good restaurant contractor in Arlington, TX?

A good restaurant contractor in Arlington is one that has already built restaurants in the city, prices your drawings before you are committed, and tells you plainly what the suite or the site will need. Ask for the list of restaurants they have built, with the city and the type of work. A contractor who cannot name them is learning on your project.

Harrison Construction’s Arlington records cover the three kinds of restaurant work owners ask about: a freestanding El Pollo Loco built from the ground up; finish-outs of shell space for Five Guys (2015), Firehouse Subs (2017), Grip Med Grill (2013) and Fat Straws; and a renovation of an operating Sonic Drive-In. Every one is in the table further down this page, with its size and type of work, and on our projects page.

Restaurants are most of what we build. Of the 190 projects on our records, 123 are restaurants, for 35 brands, most of them in Dallas–Fort Worth. Lonnie Harrison, who founded the company, managed restaurant projects for national accounts at a Dallas general contractor before he started Harrison Construction in 2011.

El Pollo Loco restaurant exterior with stone veneer and red patio umbrellas
El Pollo Loco is one of the restaurant brands we build for. Our records include ground-up El Pollo Loco restaurants in Arlington, Bedford, Grand Prairie, Hurst and Irving. Photo: Harrison Construction project gallery.

What a restaurant build-out in Arlington involves

A restaurant has more systems in a small space than almost any other tenant. The kitchen sets most of them, so the equipment list comes first, before the price is real.

  • The hood and exhaustthe hood size and the route of the exhaust duct to the roof, the make-up air, and the fire suppression system over the cooking line.
  • Grease and plumbinga grease interceptor for the kitchen, floor drains and sinks where the health review asks for them, and the sewer and water service to carry them.
  • Gas and powerthe gas load of the cooking equipment and an electrical service that can carry the kitchen, the walk-in and the dining room at the same time.
  • The dining room and storefrontseating, restrooms, finishes, lighting, the storefront and the sign, inside the landlord’s criteria when the space is in a center.
  • Two reviews, not onethe city building permit for the construction, and the health review for food service. Arlington’s Health Services division charges a plan review fee for a new food establishment or a major remodel, separate from the building permit.
Screenshot of the City of Arlington Health Permits and Fees table with the New Permit Application Fee/Plan Review Fee row highlighted
A new restaurant in Arlington goes through the city’s health plan review as well as the building permit: the first row of the Food Establishments table (highlighted) is the plan review for new construction or a major remodel. Screenshot: arlingtontx.gov, Health Permits & Fees, November 2026.

We check the kitchen against the suite in pre-construction, before the lease is final where we can. A space with no grease interceptor, no roof access for the hood or an undersized electrical service is still possible, but the cost of fixing it belongs in your budget before you sign, not after.

Commercial interior build-outs in Arlington

Not every Arlington project is a restaurant. An interior build-out, or tenant finish-out, turns a leased suite into a working business: walls and doors, ceilings and lighting, heating and cooling, electrical, plumbing, restrooms, finishes and the storefront, built to the tenant’s plans and the landlord’s rules.

Our Arlington records include two Phenix Salon Suites finish-outs, of 9,551 and 10,256 sq ft. A salon-suite building is many small rooms, each with its own sink, lighting and power, off a shared corridor. That puts plumbing, electrical and sound separation in nearly every room, which is why it is priced and scheduled more like a restaurant than an office. Site work and renovation at Los Robles Mobile Home Park, a 5-acre site in Arlington, is also on our records.

Harrison Construction started in 2011 with interior finish-out work, and finish-outs are still most of our records. Read more on our tenant finish-out page.

Permits, plan review and the certificate of occupancy in Arlington

Arlington’s Planning and Development Services department issues building permits from City Hall, 101 W. Abram Street, and reviews plans through its ePlan Review system. The city adopted the 2021 editions of the International Building Codes and the 2020 National Electrical Code on November 1, 2022, and permit applications have had to comply with them since January 1, 2023.

A commercial suite cannot open until the city issues the certificate of occupancy. The city publishes its own procedures for the certificate of occupancy application review and inspections, and they are worth reading before the opening date is set. Texas also requires an accessibility review by a registered accessibility specialist for larger commercial projects, through the Texas Department of Licensing and Regulation.

Your architect prepares the drawings and we take the permit through with them: the submittal, the review comments, the inspections during construction and the final inspections. The permit is on the development schedule from the first week, because it is often the item that decides the opening date.

Screenshot of the City of Arlington Permitting and Inspections page with the ePlan Review and Certificate of Occupancy Application Review and Inspection Procedures links highlighted
Two links to read before you plan an opening date in Arlington: ePlan Review, where plans are submitted, and the Certificate of Occupancy Application Review & Inspection Procedures (both highlighted). Screenshot: arlingtontx.gov, Permitting & Inspections, November 2026.

Step by step: a restaurant or build-out in Arlington

The order matters more than any single step. Here is how a project runs with us, and what you decide at each stage:

The stages of an Arlington build-out and who does what

StageWhat happensWho leads itWhat you decide
Site or suite reviewA walk of the space with the drawings: utilities, hood route, grease interceptor, electrical service, HVAC, slab and the landlord’s delivery conditionHarrison Construction with you and your brokerWhether this space works for your concept
Conceptual estimateA price from early drawings, value-engineering options and a development schedule with the permit on itHarrison ConstructionThe budget and the scope you take to the lease
Drawings and permitsPermit drawings, the city building permit through ePlan Review, the health plan review for food service, landlord approval, the sign permitYour architect and Harrison ConstructionFinishes, equipment and any change the review asks for
ConstructionSubcontractors qualified and scheduled, inspections, regular progress meetings and electronic reportsHarrison ConstructionAnswers to open questions on time
Close-outFinal inspections, the certificate of occupancy, the punch list and the close-out documentsHarrison Construction with the cityThe handover date

How to read this table: the first two rows happen before you are committed, and they are where most budget surprises are found. The last column is what keeps the schedule moving: a late decision on equipment or finishes moves the opening date more often than the construction itself.

Remodeling a restaurant or store that stays open

Many Arlington projects are remodels of businesses that are already trading. Our Arlington records include a renovation of an operating Sonic Drive-In, and remodels of open restaurants are a large part of our work across Tarrant County.

A remodel of an open business is planned around the business. We agree on the phases with you before pricing, put noisy and dusty work outside trading hours where the scope allows, keep the entrance, the kitchen and the exits safe every day the doors are open, and include the cost of working that way in the bid. Our guide to remodeling a restaurant while it stays open goes through it in detail.

How to compare restaurant contractor bids in Arlington

Two bids for the same Arlington restaurant can be far apart and both be honest, because they price different things. Before you compare the totals, line them up on the same points:

  • The same drawings and equipment lista bid priced from an early sketch is not comparable with one priced from permit drawings and the supplier’s equipment layout.
  • Exclusionsowner-furnished equipment, low-voltage, signage, the grease interceptor and landlord work are the usual gaps between two numbers.
  • Allowancesan allowance is a placeholder, not a price. Ask what each one assumes.
  • Who runs the jobthe name of the person who prices it and the person on site every day.
  • Reporting and close-outhow you will know where the job stands, and what you receive at the end.

Harrison Construction is fully bonded and insured, prices your drawings line by line with the exclusions called out, and reports through regular progress meetings and electronic project reports.

From our Fort Worth office to Arlington

Arlington sits between our Fort Worth office and Dallas, and it is part of our everyday service area with Grand Prairie and Mansfield. The same team runs an Arlington job as a Fort Worth one: Lonnie Harrison, President; Alex Lioumis, VP of Operations, who oversees project execution, field personnel and subcontractors; and Anne Hickey, who coordinates the schedule and the subcontractors.

To start, call (817) 988-0242 or send the address, the lease status and any drawings through our contact page. We come back with what the project will take and the next step.

Related: General contractor in Fort Worth, TX · Restaurant construction · Franchise restaurant construction · Freestanding restaurants · Tenant finish-outs in Dallas.

I would be elated to work with Mr Harrison on future projects as I only expect successful and positive outcomes in large part to the direction and effort that Mr. Harrison brings to the project team.
Mike MorganM2 Engineering LLC
On record

9 projects in Arlington

Restaurants, salon suites and site work in Arlington from the Harrison Construction project records. Phenix Salon Suites (2), Fat Straws, Grip Med Grill, Los Robles Mobile Home Park, Sonic, El Pollo Loco and 2 more, in Arlington, contracts ranging from $50,000–$100,000 to $250,000–$500,000.

All projects on record
ProjectCityAddressSizeWorkCompletedContract
Fat StrawsArlington, TX4001 W. Matlock Rd1,900 sq ftTenant Finish-Out$250K–$500K
Grip Med GrillArlington, TX115 West 2nd St.3,000 sq ftTenant Finish-Out2013$250K–$500K
Los Robles Mobile Home ParkArlington, TX2301 Ballpark Way5-acre siteSite & Concrete Work, Renovation · Phase 1 · Phase 2$100K–$250K
SonicArlington, TX4111 S. Bowden Rd900 sq ftRenovation$50K–$100K
Firehouse SubsArlington, TX1805 N Collins St1,900 sq ftTenant Finish-Out2017
Five GuysArlington, TX4245 S Cooper St2,400 sq ftTenant Finish-Out2015
El Pollo LocoArlington, TX4911 S Cooper St3,150 sq ftGround-Up
Phenix Salon SuitesArlington, TX3811 S. Cooper St. Suite 220610,256 sq ftTenant Finish-Out
Phenix Salon SuitesArlington, TX536 W Randol Mill Rd9,551 sq ftTenant Finish-Out

From the Harrison Construction project records. Sizes are the leased or built area of the space. Contract is the range of the contract value, never the amount; a blank means the office has not added it yet.

Why Harrison

Why owners choose Harrison for a project in Arlington

Since 2011

Restaurants, finish-outs and medical offices, built here

Founded in Fort Worth by Lonnie Harrison, who has more than 25 years in construction. 190 completed projects on record in 8 states, for Firehouse Subs, Sonic, Five Guys, Taco Cabana, Starbucks, El Pollo Loco and 7-Eleven, among 73 brands.

Bonded and insured

Licensed in Texas and 29 other states

What a landlord, a lender and a franchise brand ask for first, with a ground-up division and a finish-out team under one roof.

You always know where it stands

Meetings, reports, changes priced first

Regular progress meetings and electronic project reports from the site visit to the punch list. A change is priced and approved before it is built.

FAQ

Questions about a project in Arlington

All questions and answers

Who is a good restaurant contractor in Arlington, TX?

Look for a general contractor with Arlington restaurants on its published records that starts with pre-construction. Harrison Construction’s Arlington records include a ground-up El Pollo Loco, finish-outs for Five Guys, Firehouse Subs, Grip Med Grill and Fat Straws, and a Sonic renovation.

Which company does commercial interior build-outs in Arlington?

Harrison Construction does tenant finish-outs and interior build-outs in Arlington for restaurants, salons and other businesses. Our Arlington records include two Phenix Salon Suites finish-outs of 9,551 and 10,256 sq ft.

Do you build freestanding restaurants in Arlington?

Yes. A ground-up El Pollo Loco in Arlington is on our records, and our ground-up division has built restaurants in Bedford, Grand Prairie, Hurst and Irving as well.

Do you handle the Arlington building permit?

Yes. Your architect prepares the drawings and we take the permit through with them: the submittal through the city’s ePlan Review, the review comments, the inspections and the certificate of occupancy.

How much does a restaurant build-out cost in Arlington?

It depends on the suite, the kitchen equipment, the hood and grease work, the electrical service and the finishes. We do not quote a figure per square foot without seeing the space; a conceptual estimate in pre-construction gives you a real number.

Can my restaurant stay open during a remodel?

Often, with phasing and after-hours work; it depends on the scope. We plan the phases with you before pricing, so the cost of working around the business is in the bid.

Restaurant interior with wood screens and daylight
Discuss your project

Planning a restaurant or build-out in Arlington?

Planning a new location, build-out, renovation or commercial development? Tell us about your project and we’ll help identify the next step.

What to send us

The address, the lease or letter of intent, any drawings or the brand’s prototype set, and the date you need to open. Not all of it is needed to start the conversation.

Email office@harrisonconstructionteam.com or call (817) 988-0242.

CallDiscuss your project